background image

Operating instructions

S4E400-AQ12-57

Translation of the original operating instructions

4.5 Opening additional cable glands

A second cable gland opening can be made in the terminal box.

WARNING
In the event of a fault, the cable gland is energized

Electric shock
→ Do not use metal cable glands with plastic terminal boxes.

;

Screw the cable gland into the precut thread using a wrench. When
doing so, take note of the tightening torques; see Chapter 3.1 Product
drawing.

;

Remove the plastic tab that fell off inside the terminal box when it was
penetrated.

Fig. 4: Cable gland opening

NOTE
Tightness and strain relief are dependent on the cable
used.

→ This must be checked by the user.

4.6 Checking connections

;

Ensure isolation from supply (all phases).

;

Make sure a restart is impossible

;

Check the cables for proper fit.

;

Screw the terminal box cover back on again. Terminal box tightening
torque, see Chapter 3.1 Product drawing.

;

Make sure the terminal box is completely closed and sealed and that
all screws and cable glands have been properly tightened.

4.7 Switching on the device

The device may only be switched on if it has been installed properly and
in accordance with its intended use, including the required safety
mechanisms and professional electrical hookup. This also applies for
devices which have already been equipped with plugs and terminals or
similar connectors by the customer.

WARNING
Hot motor housing

Risk of fire
→ Ensure that no combustible or flammable materials are

located close to the fan.

;

Before switching on, check the device for visible external damage
and make sure the protective devices are functional.

;

Check the fan's air flow paths for foreign matter and remove any
foreign matter found.

;

Apply the nominal supply voltage.

NOTE
Damage to the device from vibration

Bearing damage, shorter service life
→ Low-vibration operation of the fan must be ensured over the

entire speed control range. #Severe vibration can arise for
instance from inexpert handling, transportation damage and
resultant imbalance or be caused by component or structural
resonance. #Speed ranges with excessively high vibration
levels and possibly resonant frequencies must be
determined in the course of fan commissioning. #Either run
through the resonant range as quickly as possible with
speed control or find another remedy.# Operation with
excessively high vibration levels can lead to premature
failure.

4.8 Switching off the device

;

Disconnect the device from the power supply at the supply line's
main switch.

;

When disconnecting, be sure to disconnect the ground connection last.

5. MAINTENANCE, MALFUNCTIONS, POSSIBLE
CAUSES AND REMEDIES

Do not perform any repairs on your device. Send the device to ebm-
papst for repair or replacement.

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

CAUTION
Electric charge on capacitor after device is switched off

Electric shock, risk of injury
→ Discharge the capacitors before working on the device.

CAUTION
The motor restarts automatically when operating voltage
is applied, e.g. after a power failure.

Risk of injury
→ Keep out of the device's danger zone.
→ When working on the device, switch off the line voltage

and ensure that it cannot be switched back on.

→ Wait until the device comes to a stop.

If the device is out of use for some time, e.g. when in storage,
we recommend switching it on for at least two hours to allow
any condensation to evaporate and to move the bearings.

Malfunction/fault

Possible cause

Possible remedy

Impeller not
running smoothly

Imbalance in rotating
parts

Clean the device;
replace it if imbalance
persists after cleaning.
Make sure no
weight clips are
removed during
cleaning.

Motor not turning

Mechanical blockage

Switch off, isolate
from supply and
remove mechanical
blockage.

Item no. 14601-5-9970 · ENU · Change 98712 · Approved 2018-04-27 · Page 9 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание S4E400-AQ12-57

Страница 1: ...hnical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules...

Страница 2: ...ence after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact wit...

Страница 3: ...device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibrat...

Страница 4: ...sions in mm 1 Direction of air flow V 2 Tightening torque 0 5 0 1 Nm 3 Cable diameter max 7 5 mm tightening torque 1 3 0 2 Nm Item no 14601 5 9970 ENU Change 98712 Approved 2018 04 27 Page 4 11 ebm pa...

Страница 5: ...plastic Blade material Sheet steel painted black Number of blades 5 Airflow direction V Direction of rotation Counterclockwise viewed toward rotor Degree of protection IP44 installation and position d...

Страница 6: ...protective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that meet the specified installation regulations for voltage current insulation material capacity etc...

Страница 7: ...nection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1 Product drawing NOTE Tightness...

Страница 8: ...tions 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow Item no 14601 5 9970 ENU Change 98712 Approved 2018 04 27 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfing...

Страница 9: ...se for instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly...

Страница 10: ...ld on the basis of German standards Right from the development stage ecological design technical safety and health protection are fixed criteria The following section contains recommendations for ecol...

Страница 11: ...mploying the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 14601 5 9970 ENU Change 98712 Approved 2018 04 27 Page 11 11 ebm papst Mulfinge...

Отзывы: