background image

Operating instructions

S4E400-AQ12-57

Translation of the original operating instructions

4.4 Connection diagram

L

= U1 = blue

Z

brown

N

= U2 = black

PE

green/yellow

Item no. 14601-5-9970 · ENU · Change 98712 · Approved 2018-04-27 · Page 8 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание S4E400-AQ12-57

Страница 1: ...hnical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules...

Страница 2: ...ence after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact wit...

Страница 3: ...device in the following ways is prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibrat...

Страница 4: ...sions in mm 1 Direction of air flow V 2 Tightening torque 0 5 0 1 Nm 3 Cable diameter max 7 5 mm tightening torque 1 3 0 2 Nm Item no 14601 5 9970 ENU Change 98712 Approved 2018 04 27 Page 4 11 ebm pa...

Страница 5: ...plastic Blade material Sheet steel painted black Number of blades 5 Airflow direction V Direction of rotation Counterclockwise viewed toward rotor Degree of protection IP44 installation and position d...

Страница 6: ...protective earth DANGER Faulty insulation Risk of fatal injury from electric shock Use only cables that meet the specified installation regulations for voltage current insulation material capacity etc...

Страница 7: ...nection Only strip the cable as far as necessary ensuring that the cable gland is sealed and there is no strain on the connections For tightening torques see Chapter 3 1 Product drawing NOTE Tightness...

Страница 8: ...tions 4 4 Connection diagram L U1 blue Z brown N U2 black PE green yellow Item no 14601 5 9970 ENU Change 98712 Approved 2018 04 27 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfing...

Страница 9: ...se for instance from inexpert handling transportation damage and resultant imbalance or be caused by component or structural resonance Speed ranges with excessively high vibration levels and possibly...

Страница 10: ...ld on the basis of German standards Right from the development stage ecological design technical safety and health protection are fixed criteria The following section contains recommendations for ecol...

Страница 11: ...mploying the proper procedures for electronic scrap Please contact ebm papst for any other questions on disposal Item no 14601 5 9970 ENU Change 98712 Approved 2018 04 27 Page 11 11 ebm papst Mulfinge...

Отзывы: