ebm-papst R4E280-AD08-13 Скачать руководство пользователя страница 8

Operating instructions

R4E280-AD08-13

Translation of the original operating instructions

4.3 Connecting the cables

The device has external leads.

;

First connect the "PE" (protective earth).

Connect the cables according to your application. When doing so,
observe Chapter 4.4 Connection diagram.

Item no. 16408-5-9970 · ENU · Change 230348 · Approved 2021-04-07 · Page 8 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R4E280-AD08-13

Страница 1: ...nd otherwise used by suitably qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicabl...

Страница 2: ... into the device Injuries can result Do not wear any loose fitting or dangling clothing or jewelry while working on rotating parts Protect long hair with a cap 1 7 Emissions WARNING Depending on the installation and operating conditions the sound pressure level may exceed 70 dB A Risk of noise induced hearing loss Take appropriate technical safety measures Protect operating personnel with appropri...

Страница 3: ...ting the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections e g screws coming loose during operati...

Страница 4: ...Accessory part inlet ring 96360 2 4013 not included in scope of delivery 2 Max clearance for screw 5 mm 3 Cable PVC AWG20 4x crimped splices Item no 16408 5 9970 ENU Change 230348 Approved 2021 04 07 Page 4 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 5: ...ting instructions All dimensions in mm Inlet ring 96360 2 4013 Item no 16408 5 9970 ENU Change 230348 Approved 2021 04 07 Page 5 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 6: ...ity with standards EN 60034 1 EN 60204 1 EN 60335 1 CE Approval CSA C22 2 No 77 UL 1004 3 With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst for support Use the device in accordance with its degree of protection Information on surface quality The surfaces of the products ...

Страница 7: ...nformation on the nameplate matches the connection data If the motor run capacitor was not installed by ebm papst check whether the information on the motor run capacitor matches the information on the nameplate Before connecting the device make sure the power supply matches the device voltage Only use cables designed for the current level indicated on the nameplate For determining the cross secti...

Страница 8: ...rst connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram Item no 16408 5 9970 ENU Change 230348 Approved 2021 04 07 Page 8 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 9: ...uctions 4 4 Connection diagram U1 blue Z brown U2 black PE green yellow Item no 16408 5 9970 ENU Change 230348 Approved 2021 04 07 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 10: ...ication see Chapter 5 Maintenance malfunctions possible causes and remedies 4 7 Switching off the device Disconnect the device from the power supply at the supply line s main switch When disconnecting be sure to disconnect the ground connection last 5 MAINTENANCE MALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replaceme...

Страница 11: ...ual inspection At least every 6 months Replacement of device Fastening the cables Visual inspection At least every 6 months Fasten Fastening the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Impeller for wear deposits corrosion and damage Visual inspection At least every 6 months C...

Страница 12: ...external rotor motors from ebm papst Mulfingen GmbH Co KG Ferrite magnets can be disposed of in the same way as normal iron and steel Electrical insulating materials on the product in cables and wires are made of similar materials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for inter...

Отзывы: