background image

Operating instructions

R4E250-BA09-03

Translation of the original operating instructions

5.4.1 Country-specific legal requirements

NOTE
Country-specific legal requirements

Always observe the applicable country-specific legal
regulations with regard to the disposal of products or waste
occurring in the various phases of the life cycle. The
corresponding disposal standards are also to be heeded.

5.4.2 Disassembly

Disassembly of the product must be performed or supervised by
qualified personnel with the appropriate technical knowledge.
The product is to be disassembled into suitable components for disposal
employing standard procedures for motors.

WARNING
Heavy parts of the product may drop off. Some of the
product components are heavy. These components
could drop off during disassembly.

This can result in fatal or serious injury and material damage.
→ Secure components before unfastening to stop them falling.

5.4.3 Component disposal

The products are mostly made of steel, copper, aluminum and plastic.
Metallic materials are generally considered to be fully recyclable.
Separate the components for recycling into the following categories:

Steel and iron

Aluminum

Non-ferrous metal, e.g. motor windings

Plastics, particularly with brominated flame retardants, in accordance
with marking

Insulating materials

Cables and wires

Electronic scrap, e.g. circuit boards

Only ferrite magnets and not rare earth magnets are used in external
rotor motors from ebm-papst Mulfingen GmbH & Co. KG.

;

Ferrite magnets can be disposed of in the same way as normal iron
and steel.

Electrical insulating materials on the product, in cables and wires are
made of similar materials and are therefore to be treated in the same
manner.
The materials concerned are as follows:

Miscellaneous insulators used in the terminal box

Power cables

Cables for internal wiring

Electrolytic capacitors

Dispose of electronic components employing the proper procedures for
electronic scrap.

→ Please contact ebm-papst for any other questions on disposal.

Item no. 10714-5-9970 · ENU · Change 226133 · Approved 2021-01-14 · Page 12 / 12

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R4E250-BA09-03

Страница 1: ... qualified trained and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following installation in the final product The locally applicable industrial safety regulatio...

Страница 2: ...ectromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against accidental contact Before working on the system machine wait until all parts have come to a standstill WARNING Rotating devi...

Страница 3: ...ld be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer installation Operation in medical equipment with a life sustaining or life support function Conveying solids in the flow medium Painting the device Connections e g screws coming...

Страница 4: ...ccessory part Inlet ring 25010 2 4013 not included in scope of delivery 2 Max clearance for screw 12 mm 3 Cable silicone 6G 0 5 mm 6x splice Item no 10714 5 9970 ENU Change 226133 Approved 2021 01 14 Page 4 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 5: ...ensions in mm Accessory part inlet ring 25010 2 4013 not included in scope of delivery Item no 10714 5 9970 ENU Change 226133 Approved 2021 01 14 Page 5 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 6: ...N 60034 1 2010 Approval EAC With regard to cyclic speed loads note that the rotating parts of the device are designed for a maximum of one million load cycles If you have special questions consult ebm papst for support Use the device in accordance with its degree of protection Information on surface quality The surfaces of the products conform to the generally applicable industrial standard The su...

Страница 7: ...f supply with multiple devices connected in parallel Electric shock risk of injury Ensure sufficient protection against accidental contact Before working on the electrical hookup short the supply and PE connections CAUTION Voltage The fan is a built in component and has no disconnecting switch Only connect the fan to circuits that can be switched off with an all pole disconnection switch When work...

Страница 8: ...cked by the customer following installation in the end device 4 3 Connecting the cables The device has external leads First connect the PE protective earth Connect the cables according to your application When doing so observe Chapter 4 4 Connection diagram 4 3 1 Motor protection CAUTION Voltage The device is a built in component and has no disconnecting switch Connect the device to a suitable tri...

Страница 9: ...s 4 4 Connection diagram TOP 2x gray U1 blue Z brown U2 black PE green yellow Item no 10714 5 9970 ENU Change 226133 Approved 2021 01 14 Page 9 12 ebm papst Mulfingen GmbH Co KG Bachmühle 2 D 74673 Mulfingen Phone 49 0 7938 81 0 Fax 49 0 7938 81 110 info1 de ebmpapst com www ebmpapst com ...

Страница 10: ...acement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at all poles before opening the device CAUTION Electric charge on capacitor after device is switched off Electric shock risk of injury Discharge the capacitors before working on the device CAUTION The motor restarts automatically when operating voltage is ap...

Страница 11: ...the device immediately and replace it Repair of load bearing or rotating parts is not permitted Operate the fan for 2 hours at maximum speed so that any water that has ingressed can evaporate If cleaning does not eliminate vibrations the fan may need to be rebalanced To have it rebalanced contact ebm papst The fan is equipped with maintenance free ball bearings The lifetime lubrication of the ball...

Страница 12: ...etallic materials are generally considered to be fully recyclable Separate the components for recycling into the following categories Steel and iron Aluminum Non ferrous metal e g motor windings Plastics particularly with brominated flame retardants in accordance with marking Insulating materials Cables and wires Electronic scrap e g circuit boards Only ferrite magnets and not rare earth magnets a...

Отзывы: