ebm-papst R3G450-AZ24-68 Скачать руководство пользователя страница 9

Operating instructions

R3G450-AZ24-68

Translation of the original operating instructions

Fig. 1: Recommended stripped lengths in mm (inside terminal box)
Legend: CL = control lines

4.3.2 Connecting wires to terminals

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the cable gland.

Only remove caps where cables are fed in.

;

Equip the cable glands with the seals provided in the terminal box.

;

Route the wire(s) (not included in scope of delivery) into the terminal
box.

;

First connect the "PE" (protective earth).

;

Connect the wires to the corresponding terminals.

Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.

Fig. 2: Connecting wires to terminals

;

Seal the terminal box.

4.3.3 Cable routing

Water must be prevented from reaching the cable gland along the cable.
When routing the cable, make sure that the cable glands are located at
the bottom. The cables must always be routed downward.

Fig. 3: Cable routing for fans installed upright.

Item no. 53913-5-9970 · ENU · Change 90396 · Approved 2016-09-21 · Page 9 / 14

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание R3G450-AZ24-68

Страница 1: ...ined and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1...

Страница 2: ...ify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against acci...

Страница 3: ...prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration...

Страница 4: ...n scope of delivery 2 Max clearance for screw 20 mm 3 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 4 Cable diameter min 9 mm max 16 mm tightening torque 6 0 9 Nm 5 Tightening torque 3...

Страница 5: ...in mm inlet ring 45075 2 4013 with pressure tap k factor 240 not included in scope of delivery Item no 53913 5 9970 ENU Change 90396 Approved 2016 09 21 Page 5 14 ebm papst Mulfingen GmbH Co KG Bachm...

Страница 6: ...d at optimum efficiency level The ErP data is determined using a motor impeller combination in a standardized measurement setup 3 4 Technical description Weight 31 kg Fan size 450 mm Rotor surface Pai...

Страница 7: ...he network operator that this device is only connected to a connection point with a Ssc value that is greater than or equal to 120 times the rated output of the arrangement 4 CONNECTION AND STARTUP 4...

Страница 8: ...sections and their required fuses line protection only no equipment protection Nominal voltage Fuse Automatic circuit breaker Cable cross section Cable cross section VDE UL VDE mm AWG 3 PE AC 380 480...

Страница 9: ...ot included in scope of delivery into the terminal box First connect the PE protective earth Connect the wires to the corresponding terminals Use a screwdriver to do so When connecting ensure that no...

Страница 10: ...Fan device address 01 Max PWM 100 Min PWM 5 Save set value to EEPROM Yes Set value requirement Analog linear Direction of action parameter set 1 Positive heating Direction of action parameter set 2 Po...

Страница 11: ...onics enable pin open or applied voltage 5 50 VDC disable bridge to GND or applied voltage 1 VDC reset function triggers software reset after a level change to 1 VDC SELV KL 3 8 Din2 Digital input 2 S...

Страница 12: ...tion on and off via power supply Switching off the device for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Discon...

Страница 13: ...4694 Recommendation Every 6 months Max vibration severity is 3 5 mm s measured at the motor fastening diameter on the motor support plate in the direction of the motor axis of rotation and perpendicul...

Страница 14: ...lified personnel with the appropriate technical knowledge The product is to be disassembled into suitable components for disposal employing standard procedures for motors WARNING Heavy parts of the pr...

Отзывы: