ebm-papst K3G710-AQ01-09 Скачать руководство пользователя страница 8

Operating instructions

K3G710-AQ01-09

Translation of the original operating instructions

4.2.5 Leakage current

For asymmetrical power systems or if a phase fails, the
leakage current can increase to a multiple of the nominal value.

4.2.6 Locked-rotor protection

Due to the locked-rotor protection, the starting current (LRA) is
equal to or less than the nominal current (FLA).

4.3 Connection in terminal box

4.3.1 Preparing cables for connection

Only strip the cable as far as necessary, ensuring that the cable gland is
sealed and there is no strain on the connections. For tightening torques,
see Chapter 3.1 Product drawing.

NOTE
Tightness and strain relief are dependent on the cable
used.

→ This must be checked by the user.

Fig. 1: Recommended stripped lengths in mm (inside terminal box)
Legend: CL = control lines

4.3.2 Connecting wires to terminals

WARNING
Live terminals and connections even with device
switched off

Electric shock
→ Wait five minutes after disconnecting the voltage at all poles

before opening the device.

;

Remove the cap from the cable gland.

Only remove caps where cables are fed in.

;

Route the wire(s) (not included in scope of delivery) into the terminal
box.

;

First connect the "PE" (protective earth).

;

Connect the wires to the corresponding terminals.

Use a screwdriver to do so.
When connecting, ensure that no wire ends fan out.

Fig. 2: Connecting wires to terminals

;

Seal the terminal box.

4.3.3 Cable routing

Water must be prevented from reaching the cable gland along the cable.
When routing the cable, make sure that the cable glands are located at
the bottom. The cables must always be routed downward.

Fig. 3: Cable routing for fans installed upright.

Item no. 51674-5-9970 · ENU · Change 90396 · Approved 2016-09-21 · Page 8 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G710-AQ01-09

Страница 1: ...authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basi...

Страница 2: ...ts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and cause injuries Take appropriate safety measures WARNING...

Страница 3: ...r and 1050 mbar Using the device within the permitted ambient temperature range see Chapter 3 6 Transport and storage conditions and Chapter 3 2 Nominal data Operating the device with all protective d...

Страница 4: ...ition for vibration absorbing elements 3 Cable diameter min 4 mm max 10 mm tightening torque 4 0 6 Nm 4 Cable diameter min 9 mm max 16 mm tightening torque 6 0 9 Nm 5 Tightening torque 3 5 0 5 Nm Item...

Страница 5: ...ement setup 3 4 Technical description Weight 158 kg Fan size 710 mm Rotor surface Painted black Electronics housing material Die cast aluminum Impeller material Sheet aluminum Inlet nozzle material Sh...

Страница 6: ...ort structure that can be used for transport After installation ensure that the blades on the fan impeller are not deformed or bent CAUTION Risk of cutting and crushing when removing device from packa...

Страница 7: ...least AWG 26 0 13 mm Protective earth contact resistance according to EN 61800 5 1 Compliance with the resistance specifications according to EN 61800 5 1 for the protective earth connection circuit m...

Страница 8: ...terminals WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at all poles before opening the device Remove the cap f...

Страница 9: ...Fan device address 01 Max PWM 100 Min PWM 8 Save set value to EEPROM Yes Set value requirement Analog linear Direction of action parameter set 1 Positive heating Direction of action parameter set 2 P...

Страница 10: ...min 10 mA AC1 2 3 NC Floating status contact break for failure 3 1 RSA RS485 interface for MODBUS RSA SELV 3 2 RSB RS485 interface for MODBUS RSB SELV 3 3 GND Reference ground for control interface S...

Страница 11: ...ation on and off via power supply Switching off the device for maintenance Switch off the device via the control input Do not switch the motor e g in cyclic operation on and off via power supply Disco...

Страница 12: ...ommendation Every 6 months Max vibration severity is 3 5 mm s measured at the motor fastening diameter on the motor support plate in the direction of the motor axis of rotation and perpendicular to th...

Страница 13: ...lified personnel with the appropriate technical knowledge The product is to be disassembled into suitable components for disposal employing standard procedures for motors WARNING Heavy parts of the pr...

Отзывы: