Fig. 3: Installing the connectors in the terminal box. The connectors
must engage properly.

;

Depending on the cable diameter, the seals included in the terminal
box must be inserted into the cable gland if necessary.

;

Route the cable(s) (not included in the scope of delivery) into the
terminal box.

;

Ensure separate routing of the supply cable(s) and the cables for
status contact and control interface. Depending on the requirements for
the end device, the physical separation of these cables in the terminal
box may be mandatory. Use the partitions inside the terminal box as
an aid to routing for this purpose.

;

First connect the protective earth "PE". Tightening torque 3.5 ±0.4 Nm

;

Connect the cables to the corresponding terminals. Use a
screwdriver to do so. When connecting, make sure the wires do not
splay out. Insert the strands until they meet with resistance.

Fig. 4: Connection of cables at terminals

;

There must not be any tensile stress between the terminal and the
cable gland. The cable must be provided with strain relief.

;

The cable glands must be tight.

;

Fit the terminal box cover, making sure that the sealing surfaces are
clean.

;

Screw in the four screws (for tightening torque, see Chapter 3.1
Product drawing).

4.3.4 Cable routing

Water must be prevented from reaching the cable gland along the cable.

NOTE
Damage caused by moisture penetration.

Moisture can penetrate into the terminal box if water is
constantly present at the cable glands.
→ To prevent the constant accumulation of water at the cable

glands, the cable should be routed in a U-shaped loop
wherever possible.

→ If this is not possible, a drip edge can be produced by

fitting a cable tie directly in front of the cable gland for example.

Item no. 56486-5-9970 · ENU · Change 254328 · Approved 2022-05-19 · Page 9 / 16

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G630-FB32-03

Страница 1: ...o carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules The safety hazards associated with the device must be assessed again following...

Страница 2: ...ore working on the system machine wait until all parts have come to a standstill DANGER Ejected parts Missing protective devices may cause balancing weights or broken fan blades to be ejected and caus...

Страница 3: ...6 Transport and storage conditions and Chapter 3 2 Nominal data Operating the device with all protective devices Following the operating instructions Improper use In particular operating the device i...

Страница 4: ...ue 4 0 6 Nm The tightening torque is designed for PVC cables If the cable materials are different the tightening torque may have to be adjusted 3 Tightening torque 1 5 0 2 Nm 4 Inlet ring with pressur...

Страница 5: ...2011 has been reached with defined air duct components e g inlet rings The dimensions must be requested from ebm papst If other air conduction geometries are used on the installation side the ebm pap...

Страница 6: ...rangement conforms to IEC 61000 3 12 provided that the short circuit power Ssc at the connection point of the customer system to the public power grid is greater than or equal to 250 times the rated o...

Страница 7: ...with the resistance specifications according to EN 61800 5 1 for the protective earth connection circuit must be verified in the end application Depending on the installation situation it may be neces...

Страница 8: ...ection must be selected taking into account the max starting current of the drive and the type of cable routing see Chapter 4 2 2 Supply connection and fuses Control and relay cables min max Rigid cab...

Страница 9: ...t the strands until they meet with resistance Fig 4 Connection of cables at terminals There must not be any tensile stress between the terminal and the cable gland The cable must be provided with stra...

Страница 10: ...eristic curve P1 IN SELV CON2 IO3 Function parameterizable see Optional interface functions table Factory setting Analog output 0 10 V max 5 mA function Fan modulation level Characteristic curve param...

Страница 11: ...159 0 Ain2 0 10V PWM analog input D159 2 Ri 100K characteristic curve parameterizable f PWM 1k 10KHz SELV Ain2 4 20mA analog input Ri 125R characteristic curve parameterizable SELV D159 3 Din3 active...

Страница 12: ...operating instructions 4 6 Equivalent circuit diagrams Item no 56486 5 9970 ENU Change 254328 Approved 2022 05 19 Page 12 16 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mulfingen Phone 49 0 793...

Страница 13: ...ng Either run through the resonant range as quickly as possible with speed control or find another remedy Operation with excessively high vibration levels can lead to premature failure The maximum per...

Страница 14: ...automatically without warning Faulty connection Isolate from supply correct connection see connection diagram Broken motor winding Replace device Inadequate cooling Improve cooling Allow the device to...

Страница 15: ...nsors depends on the device concerned and the installation situation 6 3 Cleaning To ensure a long service life check the fans regularly for proper operation and soiling The frequency of checking is t...

Страница 16: ...ns for ecological disposal of the product and its components 6 5 1 Country specific legal requirements NOTE Country specific legal requirements Always observe the applicable country specific legal reg...

Отзывы: