ebm-papst K3G310-PT08-J4 Скачать руководство пользователя страница 6

Operating instructions

K3G310-PT08-J4

Translation of the original operating instructions

Product conforming
to standard

EN 61800-5-1; CE

Approval

CSA C22.2 no. 77 + CAN/CSA-
E60730-1; UL 1004-7 + 60730-1; CCC

For cyclic speed loads, note that the rotating parts of the device
are designed for maximum one million load cycles. If you have
specific questions, contact ebm-papst for support.

;

Use the device in accordance with its protection type.

Notes on surface quality

The surfaces of the products conform to the generally applicable industrial
standard. The surface quality may vary during the production period.
Strength, dimensional stability and dimensional accuracy are not affected
by this.
The colour pigments of the paints used react perceptibly to UV light over
the course of time. This does not however have any influence on the
technical properties of the products. To prevent the formation of patches
and fading, the product is to be protected against UV radiation. Changes
in colour are not a reason for complaint and are not covered by the
warranty.

3.5 Mounting data

;

Secure the mounting screws against accidentally coming loose (e.g.
by using self-locking screws).

Strength class for
mounting screws

8.8

Any further mounting data required can be taken from the product
drawing or Section chapter 4.1 Connecting the mechanical system.

3.6 Transport and storage conditions

Max. permissible
ambient motor temp.
(transp./ storage)

+80 °C

Min. permissible
ambient motor temp.
(transp./storage)

-40 °C

3.7 Electromagnetic compatibility

EMC interference
immunity

Acc. to EN 61000-6-2 (industrial
environment)

EMC interference
emission

Acc. to EN 61000-6-3 (household
environment), except EN 61000-3-2 for
professionally used devices with a total
rated power greater than 1 kW

If several devices are connected in parallel on the mains side,
so that the line current of the arrangement is in the 16-75 A
range, this arrangement conforms to IEC 61000-3-12, provided
that the short-circuit power S

sc

at the connection point of the

customer system to the public power grid is greater than or
equal to 250 times the rated output of the arrangement. It is the
responsibility of the installation engineer or operator/owner of the
device to ensure, if necessary after consultation with the
network operator, that this device is only connected to a
connection point with a S

sc

value that is greater than or equal to

250 times the rated output of the arrangement.

4. CONNECTION AND START-UP

4.1 Connecting the mechanical system

CAUTION
Cutting and crushing hazard when removing device
from packaging

→ Carefully remove the device from its packaging, only

touching the housing. Strictly avoid shocks.

→ Wear safety shoes and cut-resistant safety gloves.

CAUTION
Heavy load when taking out the device

Bodily harm, e.g. back injuries, are possible.
→ Two people should remove the device out of its packaging

together.

NOTE
Damage to device from vibration

Bearing damage, reduced service life
→ Forces or impermissibly high vibration levels must not be

transmitted to the fan from system components.

→ If the fan is connected to air ducts, it should isolated from

vibrations, for example using compensators or similar
elements.

→ Fasten the fan to the substructure without distorting it.

;

The fan may not be handled in the area around the inlet nozzle during
transport and installation.
There is a risk of damage to the impeller.

;

Check the device for transport damage. Damaged devices must no
longer be installed.

;

Install the undamaged device according to your application.

CAUTION
Possibility of damage to the device

Serious damage may result if the device slips during assembly.
→ Keep the device fixed in position at the installation location

until all attachment screws have been tightened.

The fan must not be strained on fastening.

4.2 Connecting the electrical system

DANGER
Electric voltage on the device

Electric shock
→ Always install a protective earth first.
→ Check the protective earth.

DANGER
Incorrect insulation

Risk of fatal injury from electric shock
→ Use only cables that meet the specified installation

requirements for voltage, current, insulation material, load etc.

→ Route cables such that they cannot be touched by any

rotating parts.

Item no. 54804-5-9970 · ENG · Revision 202174 · Release 2018-12-28 · Page 6 / 13

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание K3G310-PT08-J4

Страница 1: ...ry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1 3 Basic safety rules Any safety hazards stemming from the device must be re evaluated once it is install...

Страница 2: ...he user NOTE Electrical or electromagnetic interferences after integrating the device in installations on the customer s side Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANG...

Страница 3: ...air pressure of 800 mbar to 1050 mbar Using the device in accordance with the permitted ambient temperature see chapter 3 6 Transport and storage conditions and chapter 3 2 Nominal data Operating the...

Страница 4: ...torque 1 8 0 3 Nm 2 Cable diameter min 6 mm max 10 mm tightening torque 1 8 0 3 Nm use the provided seal Cable diameter min 4 mm max 7 mm tightening torque 1 8 0 3 Nm 3 Tightening torque 1 5 0 2 Nm 4...

Страница 5: ...tion 3 4 Technical features Mass 15 5 kg Size 310 mm Motor size 84 Surface of rotor Coated in black Material of terminal box PP plastic Material of electronics housing Die cast aluminium Material of i...

Страница 6: ...of the arrangement It is the responsibility of the installation engineer or operator owner of the device to ensure if necessary after consultation with the network operator that this device is only co...

Страница 7: ...rotective earth contact resistance as per EN 61800 5 1 Compliance with the resistance specifications as per EN 61800 5 1 for the protective earth connection circuit must be verified in the application...

Страница 8: ...k ensure that no cables splice off Seal the terminal box 4 3 3 Cable routing No water may penetrate along the cable in the direction of the cable gland NOTE Damage caused by moisture penetration Moist...

Страница 9: ...in 10 mA reinforced insulation on mains side and basic insulation on control interface side 8 GND Signal ground for control interface SELV 9 RSA RS 485 interface for MODBUS RSA SELV 10 RSB RS 485 inte...

Страница 10: ...When putting the fan into service determine the speed ranges with excessive vibration levels and also any resonance frequencies that may be present When regulating the speed pass through resonance ra...

Страница 11: ...remove them afterwards Motor does not turn Mechanical blockage Switch off de energise and remove mechanical blockage Mains supply voltage faulty Check mains supply voltage restore power supply Importa...

Страница 12: ...ice Tightness of screwed cable gland Visual inspection At least every 6 months Retighten replace if damaged Condensate discharge holes for clogging as necessary Visual inspection At least every 6 mont...

Страница 13: ...external rotor motors from ebm papst Mulfingen GmbH Co KG Ferrite magnets can be disposed of in the same way as normal iron and steel Electrical insulating materials on the product in cables and wires...

Отзывы: