background image

Operating instructions

G4D225-FK10-03

Translation of the original operating instructions

2. INTENDED USE

The device is exclusively designed as a built-in device for conveying
air according to its technical data.
Any other usage above and beyond this does not conform with the
intended purpose and constitutes misuse of the device.
Customer equipment must be capable of withstanding the mechanical
and thermal stresses that can arise from this product. This applies for the
entire service life of the equipment in which this product is installed.

Intended use also includes

Using the device only in power systems with grounded neutral (TN/
TT power systems).

Conveying air at an ambient air pressure between 800 mbar and
1050 mbar.

Using the device within the permitted ambient temperature range; see
Chapter 3.6 Transport and storage conditions and
Chapter 3.2 Nominal data.

Operating the device with all protective devices.

Following the operating instructions.

Improper use

In particular, operating the device in the following ways is prohibited and
could be hazardous:

Operating the device in an unbalanced state, e.g. due to dirt deposits
or ice formation.

Resonant operation, operation with severe vibration. This also
includes vibration transmitted to the fan from the customer installation.

Operation in medical equipment with a life-sustaining or life-support
function.

Conveying solids in the flow medium.

Painting the device

Connections (e.g. screws) coming loose during operation.

Conveying air that contains abrasive particles.

Conveying highly corrosive air, e.g. salt spray. Exception: devices
designed for salt spray and correspondingly protected.

Conveying air with high dust content, e.g. suctioning off sawdust.

Operating the device close to flammable materials or components.

Operating the device in an explosive atmosphere.

Using the device as a safety component or to perform safety-related
functions.

Operation with completely or partially disassembled or manipulated
protective devices.

In addition, all applications not listed among the intended uses.

Item no. 11992-5-9970 · ENU · Change 226133 · Approved 2021-01-14 · Page 3 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание G4D225-FK10-03

Страница 1: ...ed and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1...

Страница 2: ...Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against...

Страница 3: ...prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration...

Страница 4: ...CAL DATA 3 1 Product drawing All dimensions in mm 1 Cable silicone 6G 0 5 mm 6x splice Item no 11992 5 9970 ENU Change 226133 Approved 2021 01 14 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D...

Страница 5: ...ted black Impeller material Sheet steel galvanized Housing material Sheet steel galvanized Direction of rotation Clockwise viewed toward rotor Degree of protection IP54 Insulation class F Moisture F E...

Страница 6: ...l contact Before working on the electrical hookup short the supply and PE connections CAUTION Voltage The device is a built in component and has no disconnecting switch Only connect the device to circ...

Страница 7: ...cables according to your application When doing so observe Chapter 4 4 Connection diagram 4 3 1 Motor protection CAUTION Voltage The device is a built in component and has no disconnecting switch Conn...

Страница 8: ...on diagram Star connection L1 U1 black L2 V1 blue L3 W1 brown TOP 2x gray PE green yellow Item no 11992 5 9970 ENU Change 226133 Approved 2021 01 14 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle...

Страница 9: ...Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at all poles before opening the device CAUTION The motor restarts automat...

Страница 10: ...g the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace cables Abnormal bearing noise acousti...

Страница 11: ...s Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolytic capacitors Dispose of electronic components employing the proper procedures for electronic scra...

Отзывы: