background image

Operating instructions

G2E180-EK01-13

Translation of the original operating instructions

3.2 Nominal data

Motor

M2E074-GA

Phase

1~

1~

Nominal voltage / VAC

230

230

Frequency / Hz

50

60

Method of obtaining
data

ml

ml

Valid for approval/
standard

CE

CE

Speed (rpm) / min

-1

2650

2900

Power consumption / W

300

445

Current draw / A

1.3

1.95

Capacitor / µF

8

8

Capacitor voltage / VDB

400

400

Capacitor standard

S0 (CE)

S0 (CE)

Min. ambient
temperature / °C

-25

-25

Max. ambient
temperature / °C

90

60

ml = Max. load · me = Max. efficiency · fa = Free air

cs = Customer specification · ce = Customer equipment

Subject to change

3.3 Data according to Commission Regulation (EU) 327/
2011

Actual

Req. 2015

01 Overall efficiency η

es

/ %

35.4

33.6

02 Measurement category

A

03 Efficiency category

Static

04 Efficiency grade N

45.8

44

05 Variable speed drive

No

06 Year of manufacture

The year of manufacture is specified on the
product's rating label.

07 Manufacturer

ebm-papst Mulfingen GmbH & Co. KG
Amtsgericht (court of registration) Stuttgart
· HRA 590344
D-74673 Mulfingen

08 Type

G2E180-EK01-13

09 Power consumption P

e

/ kW

0.22

09 Air flow q

v

/ m³/h

400

09 Pressure increase total p

sf

/

Pa

734

10 Speed (rpm) n / min

-1

2785

11 Specific ratio

*

1.01

12 Recycling/disposal

Information on recycling and disposal is
provided in the operating instructions.

13 Maintenance

Information on installation, operation and
maintenance is provided in the operating
instructions.

14 Additional components

Components used to calculate the energy
efficiency that are not apparent from the
measurement category are detailed in the
CE declaration.

*

Specific ratio = 1 + p

fs

/ 100 000 Pa

Data obtained at optimum efficiency level. The ErP data is determined using a motor-impeller

combination in a standardized measurement setup.

3.4 Technical description

Weight

6 kg

Size

180 mm

Motor size

74

Rotor surface

Painted black

Blade material

Sheet steel, painted black

Housing material

Die-cast aluminum

Direction of rotation

Clockwise, viewed toward rotor

Degree of protection

IP44; installation- and position-dependent
as per EN 60034-5

Insulation class

"F"

Moisture (F) /
Environmental (H)
protection class

H0+

Installation position

Shaft horizontal or rotor on bottom; rotor
on top on request

Condensation
drainage holes

On rotor side

Mode

S1

Motor bearing

Ball bearing

Touch current
according to IEC
60990 (measuring
circuit Fig. 4, TN
system)

< 0.75 mA

Motor protection

Thermal overload protector (TOP) with
basic insulation

Protection class

I (with customer connection of protective
earth)

Conformity with
standards

EN 60335-1; CE

With regard to cyclic speed loads, note that the rotating parts of
the device are designed for a maximum of one million load
cycles. If you have special questions, consult ebm-papst for
support.

;

Use the device in accordance with its degree of protection.

Information on surface quality

The surfaces of the products conform to the generally applicable industrial
standard. The surface quality may change during the production period.
This has no effect on strength, dimensional stability and dimensional
accuracy.
The color pigments in the paints used perceptibly react to UV light over
the course of time. This does not however in any way affect the
technical properties of the products. The product is to be protected against
UV radiation to prevent the formation of patches and fading. Changes in
color are not a reason for complaint and are not covered by the warranty.

3.5 Mounting data

Strength class of
screws

8.8

For screw clearance, see Chapter 3.1 Product drawing

;

Secure the screws against unintentional loosening (e.g. use self-
locking screws).

Any further mounting data required can be taken from the product
drawing or Section Chapter 4.1 Mechanical connection.

Item no. 11574-5-9970 · ENU · Change 212114 · Approved 2020-03-10 · Page 5 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание G2E180-EK01-13

Страница 1: ...ed and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1...

Страница 2: ...ctromagnetic interference after installing the device in customer equipment Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts co...

Страница 3: ...ing the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration transmitted to the fan from the customer...

Страница 4: ...t drawing All dimensions in mm 1 Cable silicone 6G 0 5 mm 6x crimped splices 2 For self tapping M4 screws Item no 11574 5 9970 ENU Change 212114 Approved 2020 03 10 Page 4 11 ebm papst Mulfingen GmbH...

Страница 5: ...eel painted black Housing material Die cast aluminum Direction of rotation Clockwise viewed toward rotor Degree of protection IP44 installation and position dependent as per EN 60034 5 Insulation clas...

Страница 6: ...hock risk of injury Ensure sufficient protection against accidental contact Before working on the electrical hookup short the supply and PE connections CAUTION Voltage The device is a built in compone...

Страница 7: ...ked by the customer following installation in the end device 4 3 Connecting the cables The device has external leads First connect the PE protective earth Connect the cables according to your applicat...

Страница 8: ...4 4 Connection diagram U1 blue Z brown U2 black PE green yellow TOP 2x gray Item no 11574 5 9970 ENU Change 212114 Approved 2020 03 10 Page 8 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2 D 74673 Mul...

Страница 9: ...device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switched off Electric shock Wait five minutes after disconnecting the voltage at...

Страница 10: ...on At least every 6 months Fasten Fastening the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Rep...

Страница 11: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...

Отзывы: