Operating instructions
G2E120-CR21-01
Translation of the original operating instructions
4.3 Connecting the cables
The device has external leads.
;
First connect the "PE" (protective earth).
●
Connect the cables according to your application. When doing so,
observe Chapter 4.4 Connection diagram.
Item no. 10514-5-9970 · ENU · Change 202174 · Approved 2018-12-28 · Page 7 / 10
ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com