background image

Operating instructions

D4D225-CC01-23

Translation of the original operating instructions

4.4 Connection diagram

Three-phase motor

Y

Star connection

Δ

Delta connection

L1

= U1 = black 1

L2

= V1 = black 2

L3

= W1 = black 3

V2

= black 4

U2

= black 5

W2

= black 6

TOP

2x white

PE

Green/yellow

Item no. 13608-5-9970 · ENU · Change 212114 · Approved 2020-03-10 · Page 8 / 11

ebm-papst Mulfingen GmbH & Co. KG · Bachmühle 2 · D-74673 Mulfingen · Phone +49 (0) 7938 81-0 · Fax +49 (0) 7938 81-110 · [email protected] · www.ebmpapst.com

Содержание D4D225-CC01-23

Страница 1: ...ed and authorized technical staff Only authorized specialists are permitted to install the device to carry out a test run and to perform work on the electrical installation 1 3 Basic safety rules 1 1...

Страница 2: ...Verify that the entire setup is EMC compliant 1 7 Mechanical movement DANGER Rotating device Risk of injury to body parts coming into contact with the rotor or the impeller Secure the device against...

Страница 3: ...prohibited and could be hazardous Operating the device in an unbalanced state e g due to dirt deposits or ice formation Resonant operation operation with severe vibration This also includes vibration...

Страница 4: ...AL DATA 3 1 Product drawing All dimensions in mm 1 Cable ETFE AWG 20 9x crimped splices Item no 13608 5 9970 ENU Change 212114 Approved 2020 03 10 Page 4 11 ebm papst Mulfingen GmbH Co KG Bachm hle 2...

Страница 5: ...nted Impeller material Sheet steel galvanized Housing material Sheet steel galvanized Motor suspension Motor vibration damped on both sides Direction of rotation Counterclockwise viewed toward rotor D...

Страница 6: ...ctrical charge 50 C between phase conductor and protective earth connection after switching off supply with multiple devices connected in parallel Electric shock risk of injury Ensure sufficient prote...

Страница 7: ...ked by the customer following installation in the end device 4 3 Connecting the cables The device has external leads First connect the PE protective earth Connect the cables according to your applicat...

Страница 8: ...nection Delta connection L1 U1 black 1 L2 V1 black 2 L3 W1 black 3 V2 black 4 U2 black 5 W2 black 6 TOP 2x white PE Green yellow Item no 13608 5 9970 ENU Change 212114 Approved 2020 03 10 Page 8 11 eb...

Страница 9: ...ALFUNCTIONS POSSIBLE CAUSES AND REMEDIES Do not perform any repairs on your device Send the device to ebm papst for repair or replacement WARNING Live terminals and connections even with device switch...

Страница 10: ...least every 6 months Fasten Fastening the protective earth terminal Visual inspection At least every 6 months Fasten Insulation of cables for damage Visual inspection At least every 6 months Replace c...

Страница 11: ...aterials and are therefore to be treated in the same manner The materials concerned are as follows Miscellaneous insulators used in the terminal box Power cables Cables for internal wiring Electrolyti...

Отзывы: