![Ebac CD85 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/ebac/cd85/cd85_owners-manual_3755654007.webp)
Page 7 of 15
Drawing : - TPC361
Issue
: - 3
Date
: - 03/10/12
OPERATION
The following procedures should be followed to test the CD85 for correct
operation:
1.
After unpacking, examine all external features to confirm damage-
free shipment. Report all defects and damage at once. Connect the
power cable to a grounded 15 Amp electrical outlet.
2.
Check dehumidification process as follows:
A.
Place unit on a level surface.
B.
Start up unit by turning the humidistat control knob until the
unit turns on.
C. Check that the compressor is running.
D.
Leave the machine running for 15 minutes.
E. Observe the evaporator coils through the evaporator filter panel
i. If the air temperature is below 80° F, an even coating of
frost should cover the entire evaporator coil
ii. If the air temperature is above 80° F, frost and/or droplets
of condensed water should cover the entire
evaporator coil.
F.
After continuous running time of approximately 55 minutes, the
unit will enter “Hot Gas” defrost mode for 5 minutes and then
automatically return to normal operation.
If, after carrying out the above procedures, the unit does not appear to
function properly, refer to the
Trouble Shooting
section, which follows,
or contact the Factory Service Center.
TO ENSURE CONTINUED FULL EFFICIENCY OF THE
DEHUMIDIFEIR, MAINTENANCE PROCEDURES SHOULD BE
PERFORMED AS FOLLOWS:
CAUTION:
ONCE THE UNIT HAS BEEN SWITCHED OFF, WAIT AT
LEAST FIVE MINUTES BEFORE RESTARTING.
E B A C C D - 8 5 I N D U S T R I A L D E H U M I D I F I E R
Pure n Natural Systems | purennatural.com | 1-800-237-9199