The following procedures should be followed to test the BD-150 for correct operation: 
 

 

1.  After unpacking, examine all external features to confirm damage-free shipment. 

Report all defects and damage at once.  Connect the power cable to a grounded 15 
Amp electrical outlet.  Connect a 12.5 mm inside diameter hose to the condensate 
outlet pipe (positioned centrally, beneath the air inlet grille).  Secure the hose using a 
worm drive clip.  The hose should at no point be raised higher than the outlet pipe.  
Failure to observe this requirement will result in flooding of the dehumidifier. 

 
 

2. 

Check dehumidification process as follows: 

 

CAUTION:

  DO NOT REMOVE COVERS WHEN UNIT IS IN 

OPERATION. 

 
 

 

A.  Place unit on a level surface. 

 
 

 

B.  Press the start button, DO NOT hold in this button for more than 1 second.  The 

unit will run.  

 
 

 

C.   Check that air is being delivered through the front outlet grille and the 

compressor is running. 

 

 

 

 

D.  After 15/20 minutes an even coating of ice should cover the evaporator coil 

(temperature below 68°F), droplets of condensate water should cover the evaporator 
coil (temperature above 68°F)  

 

E.

 

After 45 m/- 5 minutes, the dehumidifier will operate in the defrost mode 
and the evaporator coil will clear of any ice.  After 4 m/- 1 minute, the 
dehumidifier unit will again operate in the dehumidifier mode. 

 

F.

 

Allow the dehumidifier unit to run for a further 15/20 minutes and observe the 
frosting/droplets on the evaporator coil. 

 

 

If, after carrying out the above procedures, the unit does not appear to function properly, refer to 
the 

Trouble Shooting

 section, which follows, or contact the Factory Service Center. 

 

CAUTION:

  Once the unit has been switched off, wait at least five  

  

minutes before restarting. 

 

Содержание BD-150

Страница 1: ...BD 150 OWNERS MANUAL Page 1 of 12 Drawing No TPC161 Issue 2 Date 23 06 03 EBAC MODEL BD 150 1024500 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL...

Страница 2: ...s on the evaporator coil and is collected in the condensate tray which is equipped with a permanent drain The cooled air then passes through the hot condenser coil where it is reheated using the same...

Страница 3: ...Drawing No TPC161 Issue 2 Date 23 06 03 SPECIFICATIONS MODEL BD 150 HEIGHT 36 WIDTH 24 DEPTH 25 WEIGHT 165 lb AIRFLOW 1114 CFM POWER SUPPLY 115V 60Hz 1 ph FINISH Powder coated Epoxy OPERATING RANGE 4...

Страница 4: ...e B Press the start button DO NOT hold in this button for more than 1 second The unit will run C Check that air is being delivered through the front outlet grille and the compressor is running D After...

Страница 5: ...vely vacuum clean the coils WARNING DO NOT STEAM CLEAN REFRIGERATION COILS 2 Check that the fan is firmly secured to the motor shaft and that the fan rotates freely The fan motor is sealed for life an...

Страница 6: ...he side of the refrigerant compressor The charging stub should be crimped and rebrazed after servicing NEVER allow permanent service valves to be fitted to any part of the circuit Service valves may l...

Страница 7: ...3 Loss of refrigerant gas 1 Check all of the above 2 Contact the Factory Service Center 3 Contact the Factory Service Center Little or no defrost when required 1 Faulty timer 2 Faulty by pass valve 1...

Страница 8: ...020727 1 5 Evaporator Coil 3020732 1 6 Filter Dryer 3020904 1 7 Fan Motor Assembly 3035774 1 8 By pass Valve 3020810 1 9 Electronic Timer 1600500 1 10 Rotary Switch 3030555 1 11 Terminal Block 3031460...

Страница 9: ...EACH OF ANY WRITTEN OR IMPLIED WARRANTY WITH RESPECT TO THE FOREGOING DESCRIBED MERCHANDISE For Your Records Model ____________________ S N ______________________ Date Received ______________ SAVE THI...

Отзывы: