background image

Fit U-channels 11 to wall sheets 4 (

do not 

screw in yet

) as per the other walls, but 

omitting to leave an opening of 695mm 
where the door is going to be placed 
(fig3.1).

Now fit channel 15 over channels 11 and 
sheet 4 (should be a tight fit).

STEP 3:

 

Assemble the front panel and door.

7.

Supplied by

building the future together

building the future together

DURO

Now fit your door. If you have your front 
panel on a table it may be easier to fit it 
yourself now, as you can line it up while still 
in a horizontal position. Your hinges have 
already been attached to the door.

If you wish to hang and fix it vertically you 
may skip this step and go on to erecting 
your walls.

When fitting be sure to use a spacer at the 
bottom and mark any fixings that haven’t 
been pre-drilled beforehand.

fig3.3

11

11

4

4

15

15

15

15

fig3.1

20

20

fig3.2

Lastly fit U-channels 20 over 15 where the 
door space is. 

Place L-profile channel 24 at the back of 
channel 15 (on top). 

You may now fix all the channels to the 
sheets with the wafer screws via the pre-
drilled holes. 

24

20

24

15

4

5

5

Содержание EZ-16242

Страница 1: ...els Step 7 Attach the roof Congratulations on purchasing your new proudly South African eazished Before commencing the assembly we recommend that you read the instructions thoroughly Your new shed com...

Страница 2: ...dless Drill or one with long lead Gloves Goggles Saw horse 2 Supplied by building the future together building the future together DURO CONTENTS OF FASTENING KIT 1 2 Pad bolt and keeper Ph2 bit Pictur...

Страница 3: ...at right angle Inner lip bent at 10mm Front wall 2 Front Wall Module Side Back Walls Module Roof Module Picture Description Component location QTY Check Sheet Sheet 920x900 bent at right angle edges...

Страница 4: ...0 with top edges bent over Front rear 2 8 Gable Sheet 1690 with top edges bent over Inside shed 2 25 Channeling Module Cut U Channel Inside door channel 2 Door inner 1790 left right side Front wall ch...

Страница 5: ...LL COMPONENTS VIEW OF ROOF COMPONENTS 5 Supplied by building the future together building the future together DURO 5 5 21 13 21 21 21 13 1 1 18 18 2 2 15 20 20 24 15 4 4 11 11 9 9 10 8 8 6 7 19 19 7 6...

Страница 6: ...top and bottom screws to be fixed only after attaching channels fig2 2 2 18 fig2 1 You may find it easier to assemble your shed using sawhorses with timber planks attached especially if you are worki...

Страница 7: ...r to fit it yourself now as you can line it up while still in a horizontal position Your hinges have already been attached to the door If you wish to hang and fix it vertically you may skip this step...

Страница 8: ...LIST A Rear Wall B Side Wall 1 C Side Wall 2 D Front Wall E Roof Panels A B E E C D Assemble roof panels in the same manner as walls via stitching the three sheets together Refer also to p5 for assem...

Страница 9: ...s provided into pre drilled holes NOTE the top and bottom screws will secure the channel framework while the other 3 will stitch the sheets together side wall panel front wall panel Continue to secure...

Страница 10: ...d whatever modifications to your shed that you like possible additions may include Duolite Awning Naturalite Ecorib wave polycarb sheets Multilite Multiwall Fibatuf Fibreglass As this is a brand new i...

Страница 11: ...ab s perimeter 100mm bigger than the base dimensions of your shed This will allow for a 50mm edge around your shed We recommend that you slope these 50mm edges downward by 10mm so that rain water can...

Страница 12: ...lose Brackenfell Tel 021 982 3427 JHB Cnr Northway Marlboro Drive Kelvin Sandton Tel 011 804 2804 George Albert Street George Industria Tel 044 873 0508 Durban 22 Trotter Road Pine Town Tel 031 701 99...

Отзывы: