14
Installation instructions for YHH30B CCTV camera station
English
EATON
TM378 ISSUE A JUly 2020
www.eaton.com
Annex 1: Use of drying agent
A package of drying agent is provided with accessories. Put the drying agent inside the chamber after it’s well installed and wired. The
place of drying agent put shall be away from the transmission element or electrical connection zone and difficult to slip to other places,
avoid any connection fault or transmission fault caused by drying agent.