Instructional Booklet 

IB022010EN

Effective July 2019
Revision #4

Instructions for installation, operation,  

and maintenance of medium voltage 

VC-W MR2 (integral racking) 

EATON

 www.eaton.com

For breaker pan assemblies WITH test position

1. 

Insert the breaker into the breaker cell .

a. 

The breaker is now in the disconnect position .

b. 

The solid green disconnect LED will be illuminated .

c. 

To proceed further and rack the breaker to the connected 

position, the breaker must be open .

1. 

Arc gear – the compartment door must be closed  

and latched . 

2. 

Non-arc gear – it is recommended to close the door but 

not mandatory if door safety switch is not included .

2. 

Press the test button .

a. 

It is not necessary to hold the button down .

b. 

The breaker will then move to the test position .

3. 

The green disconnect LED will turn off and the yellow test LED 

will be illuminated .

a. 

The secondary plugs will mate and the breaker will now have 

control power .

b. 

At this time the breaker open and close operations can be 

electrically tested .

c. 

To proceed further and rack the breaker to the connected 

position, the breaker must be open .

1. 

Arc gear – the compartment door must be closed  

and latched . 

2. 

 Non-arc gear – it is recommended to close the door but 

not mandatory if door safety switch is not included .

4. 

Press the connect button . 

5. 

The yellow test LED will turn off and the intermediate LED will 

flash as the breaker is in motion .

6. 

Once the breaker reaches the connect position, the solid red 

connect LED will illuminate .

a. 

The breaker is now in the connect position and can  

be energized .

7. 

To rack the breaker out, the breaker must be open .

a. 

If the breaker is not open and the operator tries to press 

the disconnect button, the operator will receive an open 

permissive error “E5” .

b. 

The operator should then open the breaker .

c. 

After the breaker is open, the error can be cleared by 

pressing the disconnect button .

8. 

Once the error is cleared, the operator can rack the breaker to 

the test or disconnect position .

a. 

It is not necessary to hold the button down .

9. 

The red connect LED will turn off and the intermediate LED will 

flash as the breaker is in motion .

10. 

Once the breaker reaches the test or disconnect position,  

the solid yellow test LED or a solid green disconnect LED  

will illuminate .

a. 

If the breaker is in the test position, there is still control 

power on the breaker and the open and close operations can 

be electrically tested .

b. 

If the breaker is at the disconnect position, the secondary 

plugs will be disconnected and there will not be any power 

on the breaker .

For Auxiliary pan assemblies 

1. 

Insert the auxiliary device into the auxiliary cell .

a. 

The auxiliary device is now in the disconnect position .

b. 

The solid green disconnect LED will be illuminated .

2. 

To proceed further and rack the auxiliary to the  

connected position .

a. 

Arc gear – the compartment door must be closed and 

latched . 

b. 

Non-arc gear – it is recommended to close the door but not 

mandatory unless the door safety switch is included .

3. 

Press and the connect button .

4. 

The green disconnect LED will turn off and the intermediate LED 

will flash as the auxiliary device is in motion .

5. 

Once the auxiliary device reaches the connect position, the solid 

red connect LED will illuminate .

a. 

The auxiliary device is now in the connect position .

6. 

Press the disconnect button .

a. 

It is not necessary to hold the button down .

b. 

If the “Test” button is pressed an “E9” error will be displayed 

(auxiliaries do not have a test position) . Press the disconnect 

button to clear the error .

7. 

The red connect LED will turn off and the intermediate LED will 

flash as the auxiliary is in motion .

8. 

Once the auxiliary reaches the disconnect position, the solid 

green disconnect LED will illuminate .

Содержание VC-W MR2

Страница 1: ...Open permissive 9 Instructions for installation operation and maintenance of medium voltage VC W MR2 integral racking Description Page E6 Communication error 9 E7 No MV device 9 E8 Firmware compatibi...

Страница 2: ...2 Instructional Booklet IB022010EN Effective July 2019 Revision 4 Instructions for installation operation and maintenance of medium voltage VC W MR2 integral racking EATON www eaton com...

Страница 3: ...source governing the rights and remedies of any purchaser of this equipment is the contract between the purchaser and Eaton NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PA...

Страница 4: ...SC 29649 All possible contingencies which may arise during installation operation or maintenance and all details and variations of this equipment are not encompassed by these instructions If further i...

Страница 5: ...ive interlocks wired for every breaker cell with integrated racking and one for every auxiliary cell with integrated racking Breaker cell specific interlocks 1 Normally closed mechanism operated compa...

Страница 6: ...pass E5 error circuit CAUTION by jumpering terminals 51 to 54 you have defeated the inter lock circuit For troubleshooting move the black mo tor lead on terminal 47 to terminal 44 to bypass E2 error c...

Страница 7: ...the auxiliary pan assembly This lock prohibits an operator from manually inserting a crank into the Lev in assembly and manually racking the breaker or auxiliary device as specified in the switchgear...

Страница 8: ...hen motor current is in excess of allowed value Multiple causes could create this condition E1 error codes may occur if system is operated on temporary generator power Operator should shut off power t...

Страница 9: ...ibility error This state results from the pendant and controller card not having compatible firmware Contact your Eaton representative to have the firmware updated E9 No test MR2 open close only This...

Страница 10: ...Disconnect buttons can be used to scroll up and down 01 to 99 until the desired address number is reached While scrolling the Connect LED will continue to flash to let the user know that the address...

Страница 11: ...device from a distance of up to 30 ft 9 14 m from the equipment with a Cat 5 cable typically there will be an RJ 45 jack located on the front panel of the switchgear see Figure 14 The MV device can b...

Страница 12: ...cking device via a SCADA system or multiple Modbus interface communication systems These systems can be wired to a central control room or to a remote panel located a safe distance away from the equip...

Страница 13: ...ontrol power to breaker a At this time the breaker open and close operations can be tested electrically b To proceed further and rack the breaker to the connected position the breaker must be open 1 A...

Страница 14: ...ator should then open the breaker c After the breaker is open the error can be cleared by pressing the disconnect button 8 Once the error is cleared the operator can rack the breaker to the test or di...

Страница 15: ...15 Instructional Booklet IB022010EN Effective July 2019 Revision 4 Instructions for installation operation and maintenance of medium voltage VC W MR2 integral racking EATON www eaton com Notes...

Страница 16: ...16 Instructional Booklet IB022010EN Effective July 2019 Revision 4 Instructions for installation operation and maintenance of medium voltage VC W MR2 integral racking EATON www eaton com...

Страница 17: ...17 Instructional Booklet IB022010EN Effective July 2019 Revision 4 Instructions for installation operation and maintenance of medium voltage VC W MR2 integral racking EATON www eaton com...

Страница 18: ...n USA Publication No IB022010EN TBG001320 July 2019 Eaton is a registered trademark All other trademarks are property of their respective owners Instructions for installation operation and maintenance...

Отзывы: