7
Instruction Booklet
IB150020EN
Effective June 2019
PXG950-4G installation manual
EATON
www.eaton.com
b . PoE
Shut down your system before you change the power sources .
11 . Replace the dust caps on any unused ports .
12 . Mount your PXG950-4G .
Mounting your PXG950-4G
Mounting can be completed before or after configuring your
PXG950-4G .
Install the PXG950-4G using one of the following mounting options .
An open space of 63 .50 mm (2 .50 in .) is recommended around the
PXG950-4G for optimal air circulation .
Mounting the PXG950-4G on a DIN rail using the DIN-rail
bracket
The DIN-rail bracket includes the screws that are required for secur-
ing the bracket to the PXG950-4G .
1 . Align the screw holes on the DIN-rail bracket with the screw
holes at back of the PXG950-4G .
2 . Place the two M-4 x 5 screws on the DIN-rail bracket and secure
it to the PXG950-4G .
3 . Secure the DIN-rail mounting bracket to the PXG950-4G using
the two M-4 x 5 screws provided . Torque the screws at 8±0 .5
kilograms-centimeter (17 .64±1 .1 pounds-inch) on the DIN-rail
mounting bracket .