EQUIPMENT INSTALLATION
Eaton 9PXTFMR5, 9PXPPDM2, 9PXTFMR11, and 9PXPPDM1 User's Guide
S
P-164000200 Rev 4
13
208V
2
4
0
V
Figure 5. Installing the Cabinet in the Rack
5.
Secure the front of the cabinet to the rack with two M6x12 mm
round-head screws. Note the position of the screws in the
installation front view (see Figure 6).
UPS
EBM
9PX
Transformer
or 9PX PPDM
Two M6x12
Rail-mounting
Screws
Two M6x12
Cabinet-mounting
Bracket Screws
Figure 6. Cabinet installed in Rack (Front view)
6.
Содержание PowerPass 9PXPPDM1
Страница 10: ...INTRODUCTION Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 4...
Страница 12: ...SAFETY Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 6...
Страница 20: ...EQUIPMENT INSTALLATION Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 14...
Страница 40: ...VOLTAGE SELECTION Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 34...
Страница 50: ...STARTUP Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 44...
Страница 54: ...MAINTENANCE BYPASS Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 48...
Страница 62: ...SERVICE AND SUPPORT Eaton 9PXTFMR5 9PXPPDM2 9PXTFMR11 and 9PXPPDM1 User s Guide S P 164000200 Rev 4 56...