Installation Instructions for the Walking Beam

Interlock for PD4 Circuit Breakers and Molded  

Case Switches

EATON 

www.eaton.com

Bores

Bores

Counter

Sunk

2-1.

The walking beam interlock must be adjusted before the circuit

breakers are connected to an electrical system. Carry out 

adjustment procudure as follows:

3. ADJUSTMENT

Fig. 2-1 Hole Sizes for Installing Walking Beam Mounting Bracket.

Instruction L

eaflet 

 

Effective October 2020 

IL012380EN

WARNING

BEFORE ATTEMPTING ANY WORK ON CIRCUIT 
BREAKERS INSTALLED IN AN ELECTRICAL SYSTEM,
MAKE SURE THE CIRCUIT BREAKERS ARE SWITCHED
TO THE OFF POSITION AND THAT THERE IS NO 
VOLTAGE PRESENT WHERE WORK IS TO BE 
PERFORMED. SPECIAL ATTENTION SHOULD BE PAID 
TO REVERSE FEED APPLICATIONS TO ENSURE NO
VOLTAGE IS PRESENT. THE VOLTAGES IN ENERGIZED 
EQUIPMENT CAN CAUSE SEVERE PERSONAL INJURY
OR DEATH.

 

Determine thickness of customer-supplied mounting panel.

From Fig. 2-1, select hole type and sizes for installing walking 

beam mounting bracket. For panel thicknesses from .125 inch

to less than .500 in.(from 3.18 mm to less than 12.7 mm) use

countersunk holes. For panel thicknesses from .500 inch up to

1.00 inch (from 12.7 mm up to 25.4 mm) use counter-bored 

holes.

2-3. Install mounting bracket to back of customer-supplied

mounting panel using two screws and lock washers 

supplied (Fig.2-5).

2-4. When mounting circuit breakers to panel, insert two nylon

insulating plugs in .625 inch (15.88 mm) diameter holes 

between mounting panel and circuit breaker (Fig. 2-5).

2-2. Predrill circuit breaker mounting panel. Fig. 2-2 (PD4, 2- and

3-pole) and Fig. 2-3 (PD4, 4-pole) show mounting panel hole

sizes and dimensions for the breaker configurations.

Dimensions are in inches and (millimeters).

CAUTION

TWO NYLON SPACERS ARE PROVIDED IN THE 
WALKING BEAM INTERLOCK KIT. THE SPACERS MUST
BE INSTALLED BEFORE THE CIRCUIT BREAKERS ARE 
MOUNTED. FAILURE TO INSTALL THE SPACERS CAN
RESULT IN PHASE-TO-GROUND ARCING AND LEAD
TO EQUIPMENT FAILURE AND DAMAGE.

 

2-5. Mount circuit breakers to front surface of mounting panel

using hardware supplied with the circuit breakers. 

Plunger access holes in the back of the circuit breakers 

should line-up with holes previously drilled in panel.

2-6. Insert ends of plungers through the mounting panel, and

insulating plugs into the circuit breakers (Fig. 2-5).

2-7. Position steel beam inside legs of mounting bracket. Install

pivot pin through bracket and steel beam (Fig 2-6). Secure

pivot pin in position using two small cotter pins and 

flat washers supplied.

2-8. With both the circuit breakers in the OFF position, attach

the plungers to the  steel beam using the longer cotter pins 

supplied (Fig. 2-7). Use outer holes in steel beam for 4-pole 

application and inner holes for 2-and 3-pole applications.

3-1. Turn one circuit breaker to the ON position and the other

to the OFF position.

3-2. Screw 2 inch (50.8 mm) pan-head screw together with nut

and lockwasher into threaded hole on top of the mounting 

bracket. (Fig. 2-7).

3-3. Finger tighten the screw down on to the beam pivot pin until

all rocking of beam is eliminated. Torque the screw to 4 lb-in 

max. (0.45 N.m). 

DO NOT over-tighten.

Содержание Power Defense

Страница 1: ...1 Introduction 2 2 Installation 2 3 Adjustment 3 Instruction Leaflet IL012380EN Installation Instructions for the Walking Beam Interlock for PD4 Circuit Breakers and Molded Case Switches Effective Oc...

Страница 2: ...NSTALLATION The user is cautioned to observe all recommendations warnings and cautions relating to the safety of personnel and equipment as well as all general and local health and safety lawscodes an...

Страница 3: ...ing panel and circuit breaker Fig 2 5 2 2 Predrill circuit breaker mounting panel Fig 2 2 PD4 2 and 3 pole and Fig 2 3 PD4 4 pole show mounting panel hole sizes and dimensions for the breaker configur...

Страница 4: ...ffective October 2020 Installation Instructions for the Walking Beam Interlock for PD4 Circuit Breakers and Molded Case Switches IL012380EN 3 5 Carry out a functional check as follows b Open one circu...

Страница 5: ...ock for PD4 Circuit Breakers and Molded Case Switches Instruction Leaflet Effective October 2020 IL012380EN Drill Hole per Fig 2 1 2 Places 313 7 95 DIA 12 Places 625 15 88 Dia Hole 2 Places LOAD END...

Страница 6: ...Mounting Bracket Plungers and Long Cotter Pins Installed L Frame 4 pole Circuit Breaker Arrangement Shown Plungers Installation Instructions for the Walking Beam Interlock for PD4 Circuit Breakers an...

Страница 7: ...7 EATON www eaton com Notes Installation Instructions for the Walking Beam Interlock for PD4 Circuit Breakers and Molded Case Switches Instruction Leaflet Effective October 2020 IL012380EN...

Страница 8: ...ature is subject to the terms and conditions outlined in appropriate Eaton selling policies or other contractual agreement between the parties This literature is not intended to and does not enlarge o...

Отзывы: