background image

Series NRX with PXR - Instructions for 

Spring Release, Latch Check Switch, 

and Motor Operator

 

WARNING

(1) ONLY QUALIFIED ELECTRICAL PERSONNEL SHOULD BE PERMITTED TO WORK 

ON THE EQUIPMENT. 

(2) ALWAYS DE-ENERGIZE PRIMARY AND SECONDARY CIRCUITS IF A CIRCUIT 

BREAKER CANNOT BE REMOVED TO A SAFE WORK LOCATION.

(3) DRAWOUT CIRCUIT BREAKERS SHOULD BE LEVERED (RACKED) OUT TO THE 

DISCONNECT POSITION.

(4) ALL CIRCUIT BREAKERS SHOULD BE SWITCHED TO THE OFF POSITION AND 

MECHANISM SPRINGS DISCHARGED.

FAILURE TO FOLLOW THESE STEPS FOR ALL PROCEDURES DESCRIBED IN THIS 

INSTRUCTION LEAFLET COULD RESULT IN DEATH, BODILY INJURY, OR PROPERTY 

DAMAGE.

 WARNING

THE INSTRUCTIONS CONTAINED IN THIS IL AND ON PRODUCT LABELS HAVE TO 

BE FOLLOWED. OBSERVE THE FIVE SAFETY RULES: 

– DISCONNECTING 

–  ENSURE THAT DEVICES CANNOT BE ACCIDENTALLY RESTARTED 

–   VERIFY ISOLATION FROM THE SUPPLY 

–   EARTHING AND SHORT-CIRCUITING 

–   COVERING OR PROVIDING BARRIERS TO ADJACENT LIVE PARTS 

DISCONNECT THE EQUIPMENT FROM THE SUPPLY. USE ONLY AUTHORIZED SPARE 

PARTS IN THE REPAIR OF THE EQUIPMENT.  THE SPECIFIED MAINTENANCE 

INTERVALS AS WELL AS THE INSTRUCTIONS FOR REPAIR AND EXCHANGE MUST 

BE STRICTLY ADHERED TO PREVENT INJURY TO PERSONNEL AND DAMAGE TO 

THE SWITCHBOARD.

Instructions apply to:

Series NRX, Type NF Frame 

ANSI, UL1066, UL489 / IEC, IZMX16

Series NRX, Type RF Frame 

IEC, IZMX40

Effective May 2015

Series NRX

Instruction Leaflet

 IL0131088EN

Содержание Power Defense IZMX40

Страница 1: ...DILY INJURY OR PROPERTY DAMAGE WARNING THE INSTRUCTIONS CONTAINED IN THIS IL AND ON PRODUCT LABELS HAVE TO BE FOLLOWED OBSERVE THE FIVE SAFETY RULES DISCONNECTING ENSURE THAT DEVICES CANNOT BE ACCIDEN...

Страница 2: ...ase until the circuit breaker is fully charged and the trip latch is reset The LCS is supplied with two leads and a small 2 pin connector 2 External The LCS used for remote indication consists of one...

Страница 3: ...release is secured in its mounted position with one captive retaining screw Figure 6 Captive Mounting Screw Step 4 Section 2 Installation of Spring Release Proceed with the following eight steps Step...

Страница 4: ...ry bundle secondary wires using industry accepted wire tie practices Step 8 Replace the front cover and secure it in place with the four mounting screws previously removed in Step 1 Section 3 Removal...

Страница 5: ...p 2 Step 3 Carefully press the latch check switch down as shown until a snapping sound is heard This sound indicates the switch is properly seated Figure 10 Figure 10 Step 3 Step 4 If the latch check...

Страница 6: ...is internally connected to the spring release unplug its connector from the 2 pin plug in the spring release Figure 12 2 Pin Plug for LCS Connection Step 2 Step 3 With the spring release positioned as...

Страница 7: ...re provided in Section 2 of this document Figure 15 Motor Operator Motor Operator Location Table 3 Motor Operator Ratings NF Control Voltage Frequency Operational Voltage Range 85 110 Run Current Ampe...

Страница 8: ...ocess Section 7 Installation of Motor Operator Proceed with the following 11 steps Step 1 Remove the four screws holding the front cover in place two on each side of the cover Figure 16 Step 1 Step 2...

Страница 9: ...ft and position the motor operator so the black actuator lever rests on the pin and is settled in the mounted position IMPORTANT IT IS IMPORTANT THAT THE TWO KEYS ARE PROPERLY ALIGNED AND MATE EASILY...

Страница 10: ...d 39 NF 51 RF from the connector plug by inserting the terminal extraction tool included in the externally wired latch check switch kit into the end of the connector plug as shown The tool releases th...

Страница 11: ...ep 2 Locate the motor operator and disconnect the appropriate secondary connections as described in Section 9 Figure 27 Step 2 Step 3 Remove the motor operator from the circuit breaker by using an All...

Страница 12: ...tabs together with small needle nose pliers and pulling out Figure 31 Figure 30 Tagged Leads Keyed Connector Leads and Connectors Figure 31 Release Tabs Connector Plug Removal Fixed Breaker Connectio...

Страница 13: ...for detailed assistance with the removal Drawout Breaker Connections Proceed with the following three steps Step 1 Become familiar with the drawout secondary plug housing where secondary connections a...

Страница 14: ...utton discharged Does not actuate No change Hold OPEN button charged Does not actuate No change Spring Release with External Latch Check Switch Testing Place the circuit breaker in the different posit...

Страница 15: ...E DIESER GER TE UNTER GEF HRLICHER SPANNUNG UNSACHGEM SSER UMGANG MIT DIESEN GER TEN KANN DESHALB ZU TOD ODER SCHWEREN K RPERVERLETZUNGEN SOWIE ERHEBLICHEN SACHSCH DEN F HREN WARNUNG BEACHTEN SIE BEI...

Страница 16: ...ausl sung quittiert worden ist Reset Der Meldeschalter Einschaltbereit wird mit zwei Anschlusskabeln und einem Verbindungsstecker geliefert 2 Der Meldeschalter Einschaltbereit f r die externe Signalis...

Страница 17: ...3 Schritt 1 Schritt 2 Entfernen Sie die Frontabdeckung ziehen Sie dabei den Handhebel herunter um die Abdeckung leichter entfernen zu k nnen Abbildung 4 Schritt 2 Schritt 3 Ziehen Sie den Handhebel w...

Страница 18: ...hl ssen wie in Abschnitt 9 ausgef hrt Nutzen Sie Kabelbinder wenn n tig Schritt 8 Bauen Sie die Frontabdeckung wieder an Abschnitt 3 Entfernen des Einschaltmagneten F hren Sie die folgenden Schritte a...

Страница 19: ...Abbildung 9 Schritt 2 Schritt 3 Dr cken Sie den Meldeschalter Einschaltbereit vorsichtig in die Fassung hinein bis er einrastet Abbildung 10 Abbildung 10 Schritt 3 Sschritt 4 Wenn der Meldeschalter E...

Страница 20: ...schalter Einschaltbereit intern an den Einschaltmagneten angeschlossen ist dann l sen Sie den Verbindungsstecker vom Einschaltmagneten Abbildung 12 2 Pin Verbindungsstecker f r Verbindung zu Meldescha...

Страница 21: ...e 3 Technische Daten Motorantrieb NRX NF Bemessungssteuer speisespannung Frequenz Arbeitsbereich Anzugsspannung 85 110 Betriebsstrom Ampere Anlaufstrom Leistungsaufnahme VA Erforderliche Zeit f r das...

Страница 22: ...ebaut sein dann entfernen Sie diesen wie in Abschnitt 8 beschrieben Wenn kein Motorantrieb eingebaut ist dann fahren Sie mit Schritt 4 fort Schritt 4 Um den Einbau einfach zu gestalten berpr fen Sie o...

Страница 23: ...s des Schalters entsprechen Abbildung 19 ausgerichtet werden Nur in dieser Position l t sich der Motorantrieb montieren ACHTUNG ES IST WICHTIG DASS DER MOTORANTRIEB IN DER RICHTIGEN POSITION EINGESETZ...

Страница 24: ...Korrektur der Leitungen vorgenommen werden Entfernen Sie die Steuerleitung NRX NF Position 39 NRX RF Position 51 mit dem Steuerleitungstrenner aus dem Verbindungsstecker des Meldeschalters Stecken Si...

Страница 25: ...Schritte 1 und 2 Schritt 2 Trennen Sie die Verbindung mit den Steuerleitungsanschl ssen siehe Abschnitt 9 Abbildung 27 Schritt 2 Schritt 3 Entfernen Sie die Halteschrauben mit einem Inbusschl ssel zwe...

Страница 26: ...ernt werden indem zwei Halteklemmen mit einer kleinen Zange zusammengedr ckt werden und der Stecker herausgezogen wird siehe Abbildung 31 Abbildung 30 Gekennzeichnete Leitungen Verbindungsstecker Steu...

Страница 27: ...r cken und den Stecker herausziehen siehe Abbildung 31 Steuerleitungsverbindungen bei Schaltern in Ausfahrtechnik F hren Sie die folgenden Schritte aus Schritt 1 Machen Sie sich mit den Steuerleitungs...

Страница 28: ...rneut einzuschalten Aus Taster gedr ckt halten entspannt Keine Funktionalit t Keine Ver nderung Aus Taster gedr ckt halten gespannt Keine Funktionalit t Keine Ver nderung Funktionspr fung des Einschal...

Страница 29: ...nstruction Leaflet IL0131088EN g ltig ab Mai 2015 IZMX mit Ausl seelektronik PXR Montag eanweisung f r Einschaltausl ser Melde schalter Einschaltbereit und Motorantrieb EATON www eaton com Notes Hinwe...

Страница 30: ...herein The information contained in this manual is subject to change without notice Haftungsausschluss und Haftungsbeschr nkungen Die Angaben Empfehlungen Beschreibungen und Sicherheitshinweise in di...

Отзывы: