19
Instruction Manual
IB015002EN
Effective November 2021
Pow-R-Line CS switchboards
EATON
www.EatonCanada.ca/PRLCS
Table 3. Initial insulation resistance test record
Date
All overcurrent devices open
Phase to Phase Connections
Phase-to-ground connections
Neutral-ground
connection
A-B
A-C
B-C
A—Ground
B—Ground
C—Ground
Date
All overcurrent devices closed
Phase-to-phase connections
Phase-to-ground connections
Neutral-ground
connection
A-B
A-C
B-C
A—Ground
B—Ground
C—Ground
Notes:
Date
All overcurrent devices open
Phase-to-phase connections
Phase-to-ground connections
Neutral-ground
connection
A-B
A-C
B-C
A—Ground
B—Ground
C—Ground
Date
All overcurrent devices closed
Phase-to-phase connections
Phase-to-ground connections
Neutral-ground
connection
A-B
A-C
B-C
A—Ground
B—Ground
C—Ground
Notes:
Date
All overcurrent devices open
Phase-to-phase connections
Phase-to-ground connections
Neutral-ground
connection
A-B
A-C
B-C
A—Ground
B—Ground
C—Ground
Date
All overcurrent devices closed
Phase-to-phase connections
Phase-to-ground connections
Neutral-ground
connection
A-B
A-C
B-C
A—Ground
B—Ground
C—Ground
Notes:
Date
All overcurrent devices open
Phase-to-phase connections
Phase-to-ground connections
Neutral-ground
connection
A-B
A-C
B-C
A—Ground
B—Ground
C—Ground
Date
All overcurrent devices closed
Phase-to-phase connections
Phase-to-ground connections
Neutral-ground
connection
A-B
A-C
B-C
A—Ground
B—Ground
C—Ground
Notes:
Table 4. Switchboard inspection log
Date
Checklist
✓
Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
Date
Checklist
✓
Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
Date
Checklist
✓
Notes and actions taken
Cleaning
Bus and cable connections
Insulation inspection
Overcurrent device inspection
Meters
Controllers
Surge protective devices
Other protective devices
Secondary/control wiring
Clean ventilation
ote:
N
Refer to the “Maintenance” section on