background image

viii

Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P-164001108—Rev 01

List of Figures

Содержание PDI WaveStar BCMS

Страница 1: ...p n P 164001108 Revision 01 Installation and Operation Manual Eaton PDI WaveStar BCMS Hub...

Страница 2: ...ensure optimal performance of your Eaton PDI WaveStar BCMS Hub please carefully read the instructions before trying to install operate service or maintain the system For any questions regarding the i...

Страница 3: ...of threats including power outages surges lighting strikes and enable you to monitor and control your power infrastructure We trust that your Eaton Uninterruptible Power Supply system and Accessory Pr...

Страница 4: ......

Страница 5: ...uit 9 3 2 Customer Connections BCMS Hub 9 3 2 1 Customer Power Connections 10 3 2 2 Customer Communications Connections 11 3 3 Customer Connections BCMS Dual Hub 13 3 3 1 Customer Power Connections BC...

Страница 6: ...ome Screen 31 5 2 Startup Scans 31 5 3 Viewing Device Information 32 5 4 Clearing Alarms and Warnings 32 5 5 Bus System Device Information 32 5 5 1 End Feed 32 5 5 2 Tap Off Box 33 5 6 Panelboard Devi...

Страница 7: ...Figure 11 JCOMM Modbus Connections 18 Figure 12 Accumulator PCB Locations PowerWave 2 Bus Systems 19 Figure 13 Accumulator PCB Modbus Connections 19 Figure 14 Logging In and Out from Home Screen 21 Fi...

Страница 8: ...viii Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 List of Figures...

Страница 9: ...wer supplying equipment before working on or installing WaveStar BCMS Hub components Use a properly rated voltage sensing device to confirm power is OFF Electrical equipment should be installed operat...

Страница 10: ...2 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Safety...

Страница 11: ...es A BCMS Dual Hub doubles the monitoring capacity within the same size enclosure using a second Monitor NOTE Eaton now handles all service and support for products previously manufactured by Power Di...

Страница 12: ...s and restrictions as a single BCMS Hub Figure 2 BCMS Hub and BCMS Dual Hub Networks 2 2 3 3 S Su up pp po or rt te ed d D De ev viic ce es s The BCMS Hub collects monitoring data from BCMS devices Te...

Страница 13: ...bu us s A Ad dd dr re es ss se es s The downstream link from the BCMS Hub to its monitored devices has standard Modbus RTU restrictions Up to 32 electrical loads or drops along the downstream device c...

Страница 14: ...rical Loads maximum 4 Panelboards per RPP or JCOMM 16 RPPs JCOMMs x 4 PBs 64 Modbus addresses 24 Bus System End Feeds with 9 Tap Off Boxes each 24 End Feeds 24 Electrical Loads 24 Bus Runs with 10 add...

Страница 15: ...Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 7 Figure 3 Counting Electrical Loads and Modbus Addresses Installation Planning...

Страница 16: ...43 9433 or 1 919 870 3028 Canada 1 800 461 9166 ext 260 All other countries Call your local service representative Please use the following e mail for manual comments suggestions or to report a techni...

Страница 17: ...tective clothing and use protective equipment for performing mechanical and electrical installations Leave ample space for attaching and routing wires 3 3 1 1 M Mo ou un nt tiin ng g a an nd d C Co on...

Страница 18: ...er r P Po ow we er r C Co on nn ne ec ct tiio on ns s Customer provides input 1P 3 wire power 100VAC 277VAC 50 or 60 Hz Figure 6 1 Connect hot wire black to bottom of right fuse 2 Connect neutral whit...

Страница 19: ...e Panel 3 3 2 2 2 2 C Cu us st to om me er r C Co om mm mu un niic ca at tiio on ns s C Co on nn ne ec ct tiio on ns s Modbus RTU protocol can be used upstream to the BMS or DCIM system as the single...

Страница 20: ...Star BCMS Hub Installation and Operation Manual P 164001108 Rev 01 1 RX GREEN 2 RX BLACK 3 SHIELD WHITE UPSTREAM 4 TX YELLOW 5 TX RED 6 RX GREEN 7 RX BLACK 8 SHIELD WHITE DOWNSTREAM 9 TX YELLOW 10 TX...

Страница 21: ...and or downstream connections on the display s backpanel as shown in Figure 7 Customer Ethernet connection for an upstream TCP IP link is made to the display s backpanel Figure 7 3 3 3 3 C Cu us st to...

Страница 22: ...ire black to bottom of right fuse 2 Connect neutral white to bottom of left fuse 3 Connect ground green to the fuse DIN rail Ground to the frame from the DIN rail is wired at the factory 3 3 3 3 2 2 C...

Страница 23: ...1 RX GREEN 2 RX BLACK 3 SHIELD WHITE UPSTREAM Modbus RTU Display 1 4 TX YELLOW 5 TX RED 6 RX GREEN 7 RX BLACK 8 SHIELD WHITE DOWNSTREAM Modbus RTU Display 1 9 TX YELLOW 10 TX RED 11 RX GREEN 12 RX BLA...

Страница 24: ...ction points are where RPPs JCOMMs and PowerWave PowerWave 2 or PowerWave Silver Bus Systems are connected How these connections are made vary by the type of equipment that is monitored and whether it...

Страница 25: ...fit BCMS to Eaton equipment or other vendors equipment that is already installed If the JCOMM has a Monitor the Monitor is the electrical load Otherwise each BCMS card is an electrical load Figure 3 a...

Страница 26: ...M Mo od db bu us s R RT TU U C Co on nn ne ec ct tiio on ns s Eaton Bus System products are connected to the BCMS Hub Modbus device chain from the Accumulator PCB Figure 12 and Figure 13 in the BCMS...

Страница 27: ...aton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 19 Figure 12 Accumulator PCB Locations PowerWave 2 Bus Systems Figure 13 Accumulator PCB Modbus Connections Installation...

Страница 28: ...20 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Installation...

Страница 29: ...e associated with the PIN is displayed on the Home page when a user logs in This scheme provides a login history and accurate forensics if there is problem with the BCMS Hub The BCMS Hub has three acc...

Страница 30: ...istrator should clear any alarms that occurred Alarms must be separately cleared on each device that has alarms 4 4 1 1 4 4 U Us se er rs s S Sc cr re ee en n Figure 15 Users Screen Touch the User but...

Страница 31: ...link from the BCMS Hub to its monitored devices is always Modbus RTU at 9600 bps Modbus RTU parameters for upstream link from the BCMS Hub to the BMS or other Modbus client device is specified in the...

Страница 32: ...t restart the BCMS Hub Touch Restart in Ethernet Settings Figure 16 and wait for the system to reinitialize itself The Monitor backpanel has an Ethernet port A customer supplied Ethernet cable must be...

Страница 33: ...ou can set the BCMS Hub s clock manually or with the Time Synchronization feature 4 4 3 3 1 1 M Ma an nu ua all T Tiim me e S Se et tt tiin ng g To manually set the clock enter a date and time in Time...

Страница 34: ...tween the green check use SNTP Server and red X do not use SNTP Server 5 Press Get to initialize time and verify that Time Synchronization is working 6 Touch Set to confirm date time 7 Touch Save to s...

Страница 35: ...ification touch the E Mail tab on any screen Figure 19 Enter email Server Domain Name and email to from names using screen buttons To have emails sent to a list of contacts within an organization setu...

Страница 36: ...9 8045551212 579802 Dial out code commas to pause modem pager number commas to pause modem numeric data to be sent to pager After numbers are set up toggle Send Modem Alarms to a green check mark to...

Страница 37: ...ub Installation and Operation Manual P 164001108 Rev 01 29 Info tab the Info screen is for use by Eaton Service personnel SNMP tab SNMP is not supported on the BCMS Hub at this time Figure 21 Configur...

Страница 38: ...30 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 System Setup...

Страница 39: ...ge and alarm thresholds 5 5 1 1 H Ho om me e S Sc cr re ee en n Figure 22 Home Screen 5 5 2 2 S St ta ar rt tu up p S Sc ca an ns s At startup the BCMS Hub scans for devices in the Hub s device chain...

Страница 40: ...riin ng g A Alla ar rm ms s a an nd d W Wa ar rn niin ng gs s Alarms and warnings must be cleared from device screens Alarms cannot be cleared individually All alarms and warnings for a device are cl...

Страница 41: ...ox x A Bus System Tap Off Box has two 2 device screens Figure 25 Point values on the screens correspond to point values in the Tap Off Box iBus points list Commonly used operations are available as s...

Страница 42: ...34 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Figure 25 Tap Off Box Screens Operation Device Information...

Страница 43: ...have points lists representing panelboards The following points lists can be used with BCMS Hub Normal or Standard allows customization of warning and alarm levels for each panelboard circuit KWH prov...

Страница 44: ...s st ts s Figure 26 Panelboard BCMS KWH Points List Panelboards monitored by BCMS Normal Points Lists and BCMS KWH Points Lists are similar in layout and controls Figure 26 and Figure 27 The Warn and...

Страница 45: ...elboard BCMS Screen Controls for KWH Points List 5 5 6 6 2 2 B BC CM MS S I IE EC C P Po oiin nt ts s L Liis st t IEC panelboards can have 72 circuit breakers requiring a denser screen layout than sta...

Страница 46: ...38 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Figure 28 Panelboard BCMS IEC Points List Operation Device Information...

Страница 47: ...Events cannot be cleared individually Only a user with Administrator authorization can clear the log Figure 29 Event Log 5 5 7 7 1 1 D Do ow wn nllo oa ad d E Ev ve en nt t L Lo og g t to o P PC C The...

Страница 48: ...40 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Operation Device Information...

Страница 49: ...date Java on PCs that use BCMS Hub web pages Link to the web server from your browser using the IP address specified on Settings Screen Ethernet panel Address field Figure 17 On a BCMS Dual Hub each H...

Страница 50: ...42 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Figure 31 Panelboard Device Web Page Figure 32 Event Log Download from Web Operation Web Pages...

Страница 51: ...boards JCOMM Eaton product to retrofit BCMS to installed Eaton or non Eaton equipment KWH points list BCMS panelboard points list or Modbus register map that emphasizes the accumulation of power measu...

Страница 52: ...44 Eaton PDI WaveStar BCMS Hub Installation and Operation Manual P 164001108 Rev 01 Glossary...

Страница 53: ...p pt te er r 8 8 B Biib blliio og gr ra ap ph hy y Eaton manufactures a variety of power distribution products Product documentation can be downloaded from Eaton website https www eaton com us en us p...

Страница 54: ...P 16400110801 P 164001108 01...

Отзывы: