Emergency On Call Service: Local representative (
http://www.eaton.com/moeller/aftersales
) or +49 (0) 180 5 223822 (de, en)
3/3
03/12
IL01208008Z
Eaton Industries GmbH, Hein-Moeller-Straße 7-11, 53115 Bonn, Germany
© 2000 by Eaton Industries GmbH,
www.eaton.com/moeller/support
All Rights Reserved
03/12 IL01208008Z 10055608/DE17 DHW/DM
Printed in Germany (04/12)
-NA, -CNA
(UL/CSA models)
NZM3(-4)-XKS
It is necessary to re-install
the barrier to maintain
proper electrical clearances!
XKC
a
XKS
Removal of XKC Pressure clamp connectors to re-install XKS Screw terminations.
Removal of XKC pressure clamp connector kits will enable re-installation
of XKS screw termination connectors.
Follow diagrams in this instruction sheet in reverse order to remove the XKC
pressure clamp connectors and proceed as shown above to re-install XKS screw terminations.
-NA, -CNA
(UL/CSA models)
It is necessary to re-install
the barrier to maintain
proper electrical clearances!
10
Z 2
1.2 Nm
(11 lb-in)
11
5 mm
19 Nm
(168 lb-in)
12
13a
push
ON
3
1
8 mm
31 Nm
(275 lb-in)
13b
13c
Z 2
1.2 Nm
(11 lb-in)
push