Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
63
C
Chhaapptteerr 55 O
Onneelliinneess aanndd S
Scchheem
maattiiccss
55..11
P
Poow
weerr O
Onneelliinneess
through
show the UPS and 93PM Integrated Battery Cabinet-Large (IBC-L) intercabinet
power connection onelines.
through
show the UPS and 93PM Integrated Battery Cabinet-
Large High Rate (IBC-LH) intercabinet power connection onelines.
See paragraph
for wiring installation notes and
through
for
wiring recommendations.
Figure 32. 93PM IBC-L Line-Up-and-Match Power Oneline
UPS Cabinet
Battery Cabinet 1 Battery Cabinet 2 Battery Cabinet 3 Battery Cabinet 4
Internal
Internal
Internal
Internal
Battery
Battery
Battery
Battery
Breaker
Breaker
Breaker
Breaker
Four Battery Cabinets Maximum
NOTE
Battery cabinet wiring assumes using factory supplied wiring and one wire per pole.