background image

iii

 

Eaton Green Motion

Green Motion BuildinG and Green Motion FleetcoMMissioninG Guide

   IL191013EN   June 2023   www.eaton.com

Contents

1.0 DOCUMENT OVERVIEW  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

2.0 EV CHARGE STATION COMMISSIONING VIA WI-FI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

3.0 EV CHARGE STATION COMMISSIONING VIA ETHERNET   . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

4.0 EV CHARGE STATION COMMISSIONING VIA CELLULAR (NON-EATON SIM)  . . . . . . . . . . . . . . . . . . . . . 6

5.0 EV CHARGE STATION IN NON-CNM (NON-NETWORK) MODE  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

6.0 EV CHARGE STATION COMMISSIONING TO A THIRD-PARTY (NON-EATON) CNM SOFTWARE . . . . . . . 9

7.0 UPDATE EV CHARGE STATION LCD DISPLAY LANGUAGE (ENGLISH/FRENCH/SPANISH) . . . . . . . . . . .10

8.0 EV CHARGE STATION COMMISSIONING TOOL INSTALL AND SETUP  . . . . . . . . . . . . . . . . . . . . . . . . . . .11

Содержание Green Motion Building

Страница 1: ...Green Motion Building and Green Motion Fleet commissioning guide Eaton Green Motion...

Страница 2: ...S In no event will Eaton be responsible to the purchaser or user in contract in tort including negligence strict liability or otherwise for any special indirect incidental or consequential damage or l...

Страница 3: ...A WI FI 3 3 0 EV CHARGE STATION COMMISSIONING VIA ETHERNET 5 4 0 EV CHARGE STATION COMMISSIONING VIA CELLULAR NON EATON SIM 6 5 0 EV CHARGE STATION IN NON CNM NON NETWORK MODE 8 6 0 EV CHARGE STATION...

Страница 4: ...V charge station in a non CNM non network mode The table below outlines the EV charge station model numbers and connectivity options Model number Description Connectivity to CNM GMEV40CME1B WC 9 6 kW...

Страница 5: ...en Motion Building charger GMEV40CME1B WC Ethernet and Wi Fi LCD home screen Figure 4 LCD icons indicating status ote N Instructions on how to install this EV charger Commissioning Tool and connect to...

Страница 6: ...ton com 2 0 EV charge station commissioning via Wi Fi Model numbers GMEV40CME1B WC and GMEV80CME1B WC support Wi Fi To use Wi Fi for Eaton CNM connectivity users are required to use the Eaton EV charg...

Страница 7: ...onfirm that the EV charge station received these credentials in the Activity Log Figure 6 Activity Log showing the successful transfer of Wi Fi credentials 4 Reboot the EV charge station through the C...

Страница 8: ...nnection When an Ethernet RJ45 cable with valid internet connection is plugged in the EV charge station will automatically attempt to connect to the Eaton CNM LCD screen icons indicate both an Etherne...

Страница 9: ...ctel EC25 AFX 4G module and support Verizon AT T and T Mobile networks Please contact your SIM card provider to confirm that the SIM card is approved to be used with these EV charge stations When an a...

Страница 10: ...ge station powers up it will attempt to establish cellular connectivity with the carrier network Once successfully connected to the cellular network it will attempt to connect with the Eaton CNM Cellu...

Страница 11: ...who connects their vehicle EV drivers with physical access to the EV charge station will be able to initiate a charge session 1 Connect the EV charge station to the Commissioning Tool per instructions...

Страница 12: ...V charge station to the Commissioning Tool per instructions in Section 8 0 2 Go to Settings OCPP 3 Enter the OCPP server authentication key and certification details Please contact your CNM software p...

Страница 13: ...charge station 1 Connect the EV charge station to the Commissioning Tool per instructions in Section 8 0 2 Go to Settings LCD 3 Select the desired language Click Submit 4 Reboot the EV charge station...

Страница 14: ...d Green Motion Fleet under the Resources section Necessary tools Laptop or computer with Windows 8 10 11 and RJ45 Ethernet port RJ45 Ethernet cable Follow the below steps to install and use the EV cha...

Страница 15: ...nnect computer with EV charge station 8 3 Update TCP IP settings on your computer ote N These instructions are also displayed in detail when you click the Set Up button on the Commissioning Tool ote N...

Страница 16: ...m 3 Update the IP addresses as shown in the red box below and select OK Figure 17 IP address updates 4 You are now ready to connect the EV charge station Commissioning Tool to the EV charge station ot...

Страница 17: ...sioning guide IL191013EN June 2023 www eaton com ote N If you are still unable to connect your computer to the EV charge station please check the firewall list and add eaton green motion building and...

Страница 18: ...ct to the EV charge station you will need the EV charge station serial number which is found on a QR code sticker attached to the EV charge station Default password to log in is eaton It is recommende...

Страница 19: ...EN June 2023 www eaton com Figure 21 EV charge station serial number 3 Users will be forced to update the default password to a stronger password Strong password requirements are mentioned under Setti...

Страница 20: ...t password default password eaton by following the steps below 1 Follow the steps described in 8 1 through 8 3 to connect your computer and the EV charge station 2 Open the EV charge station Commissio...

Отзывы: