7
4.0 EV charge station commissioning via cellular (non-Eaton SIM)
Green Motion BuildinG and Green Motion FleetcoMMissioninG Guide
IL191013EN June 2023 www.eaton.com
When the EV charge station powers up, it will attempt to establish cellular connectivity with
the carrier network. Once successfully connected to the cellular network, it will attempt to
connect with the Eaton CNM. “Cellular” and “Eaton CNM” icons will be illuminated on the
display when successful connections are established.
Figure 10. LCD screen of EV charge station connected to Eaton CNM via cellular