21
Service Procedure
Central Processing Unit Installation
Procedure-
1.
Install the Central Processing Unit in its proper orienta-
tion, indicated by the arrow located on the Central Pro-
cessing Unit.
2.
Install the four (4) capscrews that hold the Central Pro-
cessing Unit in position and tighten properly.
Note:
Specific torque values vary according to OEM cap-
screw usage.
3.
Reconnect the Central Processing unit ground strap to
the Central Processing Unit.
4.
Reconnect the VORAD Harness 32-way connector to the
Central Processing Unit.
5.
Reconnect the negative battery cable.
6.
Perform Setup and Configuration as necessary.
Final Check
Make sure the Central Processing Unit orientation is correct.
Make sure the mounting screws are tightened properly.
Make sure the Central Processing Unit ground strap retaining
nut is tightened properly.
Make sure the VORAD Harness is connected and locked.
Содержание EVT-300
Страница 21: ...18 Service Procedure Service Procedure ...
Страница 27: ...24 Service Procedure Service Procedure ...