background image

 
 

INSTALLATION SPECIFICATION 

 

Eaton Industries Pty Ltd 

 

August 2010 

10 Kent Road, Mascot, NSW 2020, Australia 

 

Page 

1

 of 

13

 

 

 

DOCUMENT# 510091 

E S F   S U R G E   P O W E R   F I L T E R  

I N S T A L L A T I O N   G U I D E  

Dear Installer, 

To ensure you get the maximum benefit from this product, we ask that you carefully 
follow this installation specification. This instruction forms part of your installation 
record. Please read it thoroughly prior to commencing work and ensure that it is 
retained afterward by the equipment owner.  

Prior to commencing installation, please read the ‘

Application Statement

’ and 

complete the supplied checklists. Not completing the checklists may result in 
unpredictable performance and/or equipment damage. Eaton shall not be responsible 
for any issue arising as a result of the installation not being carried out according to 
this document. 

If you are unsure about any aspect of installing this product, or require clarification of 
any issue, please contact your local Eaton distributor or office. 

 

 

PREPARATION FOR INSTALLATION 

Prior to installation, please read the following application statement then follow the checklist after to make 
sure you are ready to commence the job. 

 

Application Statement: 

“This Surge Protective Device (SPD) is designed to provide electrical protection to 
sites using a conventional, low voltage supply with a grounded neutral. For proper 
performance, it must be installed according to the supplied instructions, as well as any 
applicable local standards and laws. This unit is intended to reduce the risk of damage 
resulting from lightning strikes, power network transients and other associated 
phenomena. No product can completely eliminate risk and it is essential that 
connected loads also be compliant to the standards applicable to ensure proper 
coordination with this unit. Only suitably-qualified personnel shall install this unit.” 

 

Please contact your local Eaton distributor or office if you do not agree with the “Application Statement”, 
otherwise please proceed to the checklist over page. 

Содержание ESF Series

Страница 1: ...t or require clarification of any issue please contact your local Eaton distributor or office PREPARATION FOR INSTALLATION Prior to installation please read the following application statement then fo...

Страница 2: ...Mounting location for geartray models is more than 150mm from any surface to the sides top and bottom with adequate clearance at the front for installation with the cable cover in place F Mounting lo...

Страница 3: ...Input and output cables must be kept well apart Minimum distance is 300mm F IF INSTALLED IN A SWITCHBOARD THE LOAD EARTH IS TO BE DIRECTLY CONNECTED TO MAIN SYSTEM EARTH NOT THIS UNIT F Ensure that y...

Страница 4: ...ect may be required prior to commissioning or the actual commissioning may be carried out or witnessed by an energy authority representative For these reasons ensure that the enclosed instructions are...

Страница 5: ...ed with unit For safety one anchor should be capable of supporting this weight alone F Attach the mounting brackets using the short M8 fasteners supplied F Using a suitable lifting device or a team of...

Страница 6: ...INSTALLATION SPECIFICATION Eaton Industries Pty Ltd August 2010 10 Kent Road Mascot NSW 2020 Australia Page 6 of 13 DOCUMENT 510091...

Страница 7: ...INSTALLATION SPECIFICATION Eaton Industries Pty Ltd August 2010 10 Kent Road Mascot NSW 2020 Australia Page 7 of 13 DOCUMENT 510091...

Страница 8: ...INSTALLATION SPECIFICATION Eaton Industries Pty Ltd August 2010 10 Kent Road Mascot NSW 2020 Australia Page 8 of 13 DOCUMENT 510091...

Страница 9: ...this case the normal safety earthing conductor should still be connected at the supply point Ensure that the correct wiring diagram is followed for each model Refer to the diagrams on the preceding pa...

Страница 10: ...ing is required fit the 16mm cable gland removing the blanking plug first F Connect alarm cable must be double insulated through the 16mm cable gland F Using self adhesive cable tie holders secure ala...

Страница 11: ...the master switch if applicable Power should now be applied to the unit F After a short period 5 seconds there should be a blue indicator visible through the window on the door panel Be aware of any...

Страница 12: ...e would like to hear from you if you have any suggestions or complaints regarding our products Please contact your supplier to discuss the matter Finalised by Date Warranty Eaton Industries warrants t...

Страница 13: ...______________________________________________________________________ ______________________________________________________________________ _________________________________________________________...

Отзывы: