Eaton EF-CBD130 Скачать руководство пользователя страница 12

12

InstallatIon anD opERatIon manual

   25-17603-C

   

March 2023   www.eaton.com

5. Commissioning Beam Detector

5.1. Commissioning Preparation

1.  Make sure both beam detector and reflector are mounted correctly and 

secure.

2.  Make sure that there is a clear line of sight between the beam detector and 

the reflector and the alignment angle is correct.

3.  Make sure that the correct number of reflectors are installed for the distance 

covered.

4.  Make sure the Span settings are correct for the distance covered, these are  

adjusted through the DIP Switch depending on the distance between the 

detector and reflector. [Span1:8-20meters; Span2:20-40meters, Span3:40-

70meters, Span4:70-100meters].

5.  Confirm cable terminations are correct.

5.2. Step 1: Entering Commissioning Method

A.  Remove the detector cover and power on the device.
B.  Place the supplied magnetic tool alongside the Reed Switch. After a while 

the Green LED [HL1] should turn on steady or blinking, and then take out the 

magnetic tool to start the detector auto alignment process.

ote: 

n

Keep the line of sight clear between the detector and reflector. Do not disturb 

the detector auto alignment process.

5.3. Step 2: Sightline Alignment Procedure

A.  The Laser Beam Pointer should turn on automatically. Look at the reflector 

and check to see if the laser is pointing at the centre.

B.  Once you have located the mark, loosen the M4x12 screw and adjust the 

horizontal or vertical adjustment wheel until the Laser is pointing at centre 

of the reflector. Refer to figure 8.

ote: 

n

During the adjustment period the digital display guide indicates a number- it is 

not indicating the signal intensity. If the number turns to zero [0] it means the 

Sightline Adjustment is not appropriate and more adjustment is required.

5.4. Step 3: Acceptable Adjustment Procedure

A.  Adjust the signal intensity through the horizontal or vertical adjustment 

wheel monitor the signal intensity through digital display guide, the number 

is indicating the signal intensity from 1 to 8. Try to reach number eight [8] 

to achieve acceptable adjustment. However, for long path span number 2 

or 3 is an acceptable adjustment. Make sure that the line of sight is clear 

between the detector and reflector.

Содержание EF-CBD130

Страница 1: ...EF CBD130 Conventional Reflective Beam Detector Installation and operation manual...

Страница 2: ...reparation 8 3 4 Mounting of the Beam Detector 9 3 5 Mounting of the EF CBD130 R Reflector 9 3 6 Cabling Details 10 4 PROGRAMMING SENSITIVITY AND SPAN 11 5 COMMISSIONING BEAM DETECTOR 11 5 1 Commissio...

Страница 3: ...potentially hazardous situation which if not avoided can result in serious injury or death CAUTION Indicates a potentially hazardous situation which if not avoided can result in minor to moderate inju...

Страница 4: ...s on the principle of reflective infrared beam obscuration Used in conjunction with a reflector it will notify the fire alarm panel when the infrared beam is obscured by smoke The EF CBD130 is ideal f...

Страница 5: ...meters Limited Path Span 2 20 to 40 meters Short Path Span 3 40 to 70 meters Normal Path Span 4 70 to 100 meters Long Path Beam Path Angle 0 4 Directional This data takes the average of the left and...

Страница 6: ...lgorithm the detector will take appropriate action and activate the corresponding relays and LED indicators To avoid false alarms the detector and reflector should be mounted on a solid structure care...

Страница 7: ...8 5mm 158 5mm Alignment Fault Fire 39 54mm 30 53mm Alignment Fault Fire 71 8mm 5 89mm Figure 2 Detector Diagram 3 2 LED Indicators LED Indicators Colour Function Fire Red Illuminates when at least one...

Страница 8: ...8 meters the beam detector should be installed between 0 5 meters to 1 meter below the ceiling level Refer to Figure 3 If the ceiling height is more than 8 meters the beam detector should be installe...

Страница 9: ...e bracket is secure and free from movement Refer to Figure 4 3 Fix the detector base onto the bracket using two M4x12x10 standard screws 79mm 85mm 158 5mm 158 5mm Figure 4 Mounting Bracket Figure 5 Be...

Страница 10: ...flector 3 6 Cabling Details Cables should be brought into the detector using the supplied cable gland The maximum size of the cable which can be terminated is 1 5mm Observe the polarity Refer to Figur...

Страница 11: ...ion range and sensitivity should be set according to the application environment The sensitivity and span of the detector can be set using the DIP switches Use DIP switch SW2 to set the parameter set...

Страница 12: ...auto alignment process ote N Keep the line of sight clear between the detector and reflector Do not disturb the detector auto alignment process 5 3 Step 2 Sightline Alignment Procedure A The Laser Be...

Страница 13: ...and Green LED Alignment will begin blinking simultaneously for about 3 seconds then Red LED Fire will begin blinking every 3 seconds indicating that the beam detector is commissioned Keep the detecto...

Страница 14: ...onment of the detector the emitting window receiving window and reflector will be covered with dust which will affect normal operation In order to solve the problem we designed the function of automat...

Страница 15: ...e conditions 8 Troubleshooting Guide Trouble Comment Troubleshooting Advice Indicates Faults after commissioning The detector is Dirty The line of sight between detector and reflector was moved Not pr...

Страница 16: ...form of fire all the time Generally speaking detectors may not warn you about fire caused by insufficient safety measures violent explosions leaking gas improper storage of flammable materials like di...

Отзывы: