Step 4: Manually start the engine generator at the gen-
erator controller.  Check that the 

Source 2 Available

light is lit (Figure 6).  Check all Voltages phase to phase
and phase to neutral.

Note: The transfer switch is equipped with a time
delay feature when in the Neutral position.  This fea-
ture provides a delayed transition transfer mode for
an Open Transition Transfer Switch.  Often used in
systems with inductive loads, a delayed transition
transfer switch may prevent or reduce excessive
inrush currents due to out of phase switching of
loads.  This switch provides a time delay in the
Neutral position during the transfer and re-transfer
operations in which both Source 1 and Source 2 are 

disconnected from the load circuit.  The time delay
is adjustable and is the same for both transfer and
re-transfer operations.  The range is from 3-60 sec-
onds.

Step 5: Move the Selector Switch, on the Device Panel,
to Source 2 (Figure 7).  The Transfer Switch will move
to the Neutral Position, delay, and then move to the
Source 2 position.  Check the 

Source 1 Connected light

and make sure it is extinguished.  Check that the
Source 2 Connected light is illuminated.  Return the
Selector Switch to Source 1.  Make sure the Transfer
Switch returns to 

Source 1 and the Source 1 Connected

light illuminates (Figure 6).  Shut down the Generator
after the manufacturer’s recommended cool down time.

IM01602002E

For more information visit: www.cutler-hammer.eaton.com

Instruction Leaflet

Page 

4

Effective: June 2003 

Non-Automatic 
Transfer Switch
Quick Start Instructions

Figure 6  Utility Supplying Load and Generator Running

Figure 7  Generator Supplying Load

The following lights should be ON:

● 

Source 1 Available

● 

Source 1 Connected

● 

Source 2 Available

The following lights should be ON:

● 

Source 1 Available

● 

Source 2 Available

● 

Source 2 Connected

Содержание Cutler-Hammer

Страница 1: ...S CAN RESULT IN DEATH SEVERE PERSONAL INJURY OR PROPER TY DAMAGE Step 1 Mount the transfer switch on a flat rigid surface Figure 1 Shim if necessary For seismic mounting requirements check the instruc...

Страница 2: ...4 pole transfer switches connect load cables T4 Source 1 or utility supply N4 and Source 2 or genera tor supply E4 Refer to Figure 2 for the location of all parts discussed in this document Load cable...

Страница 3: ...ted Light should illuminate Figure 5 Using a voltmeter check for proper system voltage on the nor mal and load terminals Check all phases on a three phase switch Voltage measurements should be taken p...

Страница 4: ...operations The range is from 3 60 sec onds Step 5 Move the Selector Switch on the Device Panel to Source 2 Figure 7 The Transfer Switch will move to the Neutral Position delay and then move to the So...

Страница 5: ...Figure 10 and Figure 11 then remove the key The Transfer Switch will move to the neutral position and remain there until the Keyed Selector Switch is returned to the Energized position Operation 3 To...

Страница 6: ...IM01602002E For more information visit www cutler hammer eaton com Instruction Leaflet Page 6 Effective June 2003 Non Automatic Transfer Switch Quick Start Instructions...

Страница 7: ...IM01602002E For more information visit www cutler hammer eaton com Instruction Leaflet Page 7 Effective June 2003 Non Automatic Transfer Switch Quick Start Instructions...

Страница 8: ...01602002E ISI June 2003 Eaton Corporation Cutler Hammer business unit 1000 Cherrington Parkway Moon Township PA 15108 4312 USA tel 1 800 525 2000 www cutler hammer eaton com Instruction Leaflet Page 8...

Отзывы: