Non-Automatic 
Transfer Switch
Quick Start Instructions

Figure 2  400A, 4 Pole, Non-Automatic Transfer Switch Interior

Step 2: Install power cables.  Cables shall be sized and
installed per National Electrical Code, refer to NFPA70.
The cable must be sized within the specified cable size
range on the side of the cable connectors.

Connect cables and torque to correct value indicated on
the label near the lugs in the following order: [1] Load
Cables(T1, T2, T3), [2] Source 1 or Utility Supply (N1,
N2, N3), [3] Source 2 or Generator Supply (E1, E2, E3).

For 4 pole transfer switches, connect load cables (T4),
Source 1 or utility supply (N4), and Source 2 or genera-
tor supply (E4).  Refer to Figure for the location of all
parts discussed in this document.

*

Load cables on switches using the vertical design

MUST be connected and torqued BEFORE installing
the SUPPLY cables (Figures and 4).

Voltage Selector
Plug (Factory set at
600 VAC)

Optional Feature 37 Fuse
Disconnect Block

Transformer Panel

Option 41A, 100 Watt
Heater.
Note: Optional 
Feature 41A, 100
Watt Heater Located
on Door

Feature 32A Timer

Source 1 Molded
Case Device

Source 1
Availability Relay
(Not for Customer
Use)

Motor Disconnect

KV Voltage Relay

Voltage Selection
Connectors

Source 2 (S2)
Power Terminals

Source 2 Molded
Case Device

Transfer
Mechanism

Indicator
Wheel

Manual
Operating
Handle

Source 1 (S1)
Power Terminals

Power
Panel

Load Lugs
(Top Entry)

Содержание Cutler-Hammer

Страница 1: ...S CAN RESULT IN DEATH SEVERE PERSONAL INJURY OR PROPER TY DAMAGE Step 1 Mount the transfer switch on a flat rigid surface Figure 1 Shim if necessary For seismic mounting requirements check the instruc...

Страница 2: ...4 pole transfer switches connect load cables T4 Source 1 or utility supply N4 and Source 2 or genera tor supply E4 Refer to Figure 2 for the location of all parts discussed in this document Load cable...

Страница 3: ...ted Light should illuminate Figure 5 Using a voltmeter check for proper system voltage on the nor mal and load terminals Check all phases on a three phase switch Voltage measurements should be taken p...

Страница 4: ...operations The range is from 3 60 sec onds Step 5 Move the Selector Switch on the Device Panel to Source 2 Figure 7 The Transfer Switch will move to the Neutral Position delay and then move to the So...

Страница 5: ...Figure 10 and Figure 11 then remove the key The Transfer Switch will move to the neutral position and remain there until the Keyed Selector Switch is returned to the Energized position Operation 3 To...

Страница 6: ...IM01602002E For more information visit www cutler hammer eaton com Instruction Leaflet Page 6 Effective June 2003 Non Automatic Transfer Switch Quick Start Instructions...

Страница 7: ...IM01602002E For more information visit www cutler hammer eaton com Instruction Leaflet Page 7 Effective June 2003 Non Automatic Transfer Switch Quick Start Instructions...

Страница 8: ...01602002E ISI June 2003 Eaton Corporation Cutler Hammer business unit 1000 Cherrington Parkway Moon Township PA 15108 4312 USA tel 1 800 525 2000 www cutler hammer eaton com Instruction Leaflet Page 8...

Отзывы: