background image

7

Instruction Leaflet 

IL157002EN

Effective July 2019

Eaton BLR-ACX 

Quick commissioning guide 

  

EATON

 www.eaton.com

PF value shows unity or does not change even after steps 

are engaged

1 .  Location of CT is incorrect . Ensure that the CT is connected 

electrically ahead of the capacitor bank (at the service entrance 

panel or switchgear) and is not connected on the feeder that 

supplies power to the capacitor bank .

2 .  Steps have failed .

Incorrect measurement values

1 .  Check that CT and PT ratios are programmed correctly in  

Menu 100 .

2 .  Check that Nominal voltage is programmed correctly in  

Menu 100 .

Controller not switching on additional steps and does not 

reach target PF

This usually happens when the amount of capacitance available does 

not match the amount of kvar required . This can happen especially 

in low load situations when the amount of kvar required is very 

low compared to the smallest available step size (for example, 

total kvar required is 12 kvar and the smallest step size available 

is 60 kvar) . The controller will not bring on any step to prevent 

overcompensation .

1 .  Check that the sensed and programmed capacitor step sizes are 

set and match the actual value .

2 .  Check that the setting in 314 is set to N .
3 .  Check the amount of shortfall kvar (

Q) in the measurement 

menu and program this value in menu 312 .

4 .  If all above fails, one may need to install smaller kvar size steps 

to allow the controller to switch them during low demand .

BLR-ACX controller technical data

Description

Specification

Measuring and  

supply voltage

90–550 Vac, single-phase, 45–65 Hz, 5 VA,  

max. fuse 6 A VT-ratio from 1.0 to 350.0

Current measuring

15 mA – 6 A, single-phase, burden 20 mohm,  

ct-ratio from 1 to 9600

Control exits

Up to 14 relays, n/o, with common point, max. fuse 6 A 

breaking capacity: 250 Vac / 5 A

Temperature measuring

By NTC

Alarm contact

Relay, volt free, life contact, max. fuse 6 A,  

breaking capacity: 250 Vac / 5 A

Interface

TTL, rear

Ambient temperature

Operation: –20 °C to 70 °C, storage: –40 °C to 85 °C

Humidity

0–95%, without moisture condensation

Voltage class

II, dirt class 3 (DIN VDE 0110, part 1 / IEC 60664-1)

Conformity and listing

Connection 

Pluggable terminal block, screw type max. 4 qmm

Case

Front: instrument case PC/ABS (UL94-VO), Rear: metal

Protection class

Front: IP50, (IP54 by using a gasket), Rear: IP20

Retrofit installations with  

BLR-ACX controller

Please retain and follow all instructions and safety precautions 

during and after installation .

1 .  Compare voltage and current ratings of BLR-ACX with data of 

mains and installation .

2 .  Mount the relay in the control panel with the two mounting clips .
3 .  Connect protection GROUND to PE connection of metal case .
4 .  BLR-ACX is to be connected according to the wiring diagram .
5 .  Ensure that the short-link for CT input signal is removed .
6 .  Typical wiring diagram of the controller is shown below . This 

may not match the existing installation . Please consult Eaton for 

retrofitting this into existing Eaton capacitor banks .

 

load

K

L

Um1 Um2

A

M

MS

1

14

1-14

T1

T2

external

temperature sensor

or temperature switch

(parallel use of sensor

and switch is possible)

up to 14

control exits

control exits can

be parametered 

for fan control

signal:

in order

(life-contact)

K1

K14

K1-K14

L1
L2
L3

N
PE

BLR-CX

TTL

Interface

X/1A or X/5A

10mA - 6A

90V - 550V

power-input 

utility

Figure 4. Wiring diagram

Troubleshooting

Symptom

Correction

No control power 

Check primary control fuses (three fuses located in  

fuse holder) and secondary fuse located on control 

transformer.
Check disconnect or circuit breaker is ON.
Check GFCI located on control panel inside cabinet.
Check the reactor thermal switches status  

(open if operated, closed if healthy).

Displayed power factor  

is obviously wrong or  

decreases as stages engage

CT secondary current is too low (check CT tap  

setting and plant load).
CT polarity is incorrect or leads are reversed.

Stages do not engage  

and target power factor  

has not been reached

Confirm that an inductive power factor is being  

displayed (i.e., ‘i.73’, not ‘c.73’).
Confirm that the required reactive power is at least  

60% of the smallest step size available for switching.
Confirm availability of capacitor stages and there is  

no stage alarm.
Confirm “AUTO” is being displayed on the controller.

Blown fuse lights on  

front cabinet are lit  

(w/no blown fuses)

Check 3 primary control fuses (on control panel) if  

check system voltage matches the nameplate voltage.

Displayed power factor does  

not change as stages engage

Review ‘Current transformer placement and connection’

Controller troubleshooting

Refer to “Controller setup procedure” section.

Содержание BLR-ACX

Страница 1: ...EN Effective July 2019 Contents Description Page Screen legends 2 Operation 2 Commissioning 2 Overview 3 Menu structure 5 Troubleshooting 6 Retrofit installations with BLR ACX controller 7 Eaton BLR A...

Страница 2: ...would be appropriate for most installations A c at the end indicates capacitive power factor and suggests reactive power export and may not be appropriate Refer to the troubleshooting section for res...

Страница 3: ...PF should change in the right direction For example 0 70 i 0 78 i 0 85 i If the PF changes in the right direction the capacitor bank has been correctly commissioned If not please refer to the troubles...

Страница 4: ...Step 14 ON OFF Basic Programming Mode 100 level menu Un nominal voltage ULL CT CT ratio PT PT or VT ratio Ai automatic initializing PFC power factor control on off CP1 target power factor St switchin...

Страница 5: ...2 at KW export N 305 Switching time delay 60 s 306 Switching time delay for fine control 10 s 307 Fine control active N for units with equal stage sizes Y for units with multiple stage sizes 308 Stop...

Страница 6: ...it is within its operating parameters The controller will show I LO alarm if there is no measured current or the magnitude sensed is less than 15 mA If the current is greater than 6 A the controller w...

Страница 7: ...ase Front instrument case PC ABS UL94 VO Rear metal Protection class Front IP50 IP54 by using a gasket Rear IP20 Retrofit installations with BLR ACX controller Please retain and follow all instruction...

Страница 8: ...019 Eaton All Rights Reserved Printed in USA Publication No IL157002EN Z23003 July 2019 Eaton is a registered trademark All other trademarks are property of their respective owners Eaton BLR ACX Quick...

Отзывы: