ATC-100 Contactor Based Transfer Switch
Step 9:
ATC1 Controlled ATS Power Failure Test - Initiate a Load
Test by simulating an actual power failure.
1. This should be done by opening the upstream breaker
or fused disconnect switch.
2. The generator should start and the ATS should trans-
fer to the Generator.
3. After transfer, close the upstream breaker, or close
the Utility Control Circuit Fused Disconnect. The
TDEN timer should begin counting, and, when com-
plete, the ATS should transfer to the Utility. The
TDEC should time out and shut the Generator power
unit down.
NOTICE
WHILE PERFORMING TESTING, IF AN UNDESIRED OR UNDOCU-
MENTED RESULT OCCURS, FIRST CONTACT THE LOCAL GENSET
DEALER. IF THE RESULT IS NOT CORRECTED, CONTACT THE
EATON POWER QUALITY SUPPORT CENTER AT 1-800-354-2070.