Page 21
614-20306-00 - 9SX 0-6 KVA EMEA_EN
3. Installation
I - Separate input sources connection
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the upstream protection device Input source is open ("O")
(OFF).
Always connect the earthing wire first.
1
. Remove the metal jumper.
2
. Insert the Input source cable through the cable gland.
3
. Connect the 3 cables to the Input terminal block.
4
. Insert the Bypass source cable through the cable gland.
5
. Connect the 3 cables to the Bypass terminal block.
6
. Insert the Output cable through the cable gland.
7
. Connect the 3 cables to the output terminal block
(10 lb in / 1.2 Nm).
8
. Put back and secure the terminal block cover with the 4
screws.
9
. Tightened the cable glands.
J - Frequency converter connection
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the upstream protection device Input source is open ("O")
(OFF).
Always connect the earthing wire first.
1
. Remove the metal jumper.
2
. Insert the Input source cable through the cable gland.
Do not connect anything to the Bypass terminal
block.
3
. Connect the 3 cables to the Input terminal block.
4
. Insert the Output cable through the cable gland.
5
. Connect the 3 cables to the output terminal block
(10 lb in / 1.2 Nm).
6
. Put back and secure the terminal block cover with the 4
screws.
7
. Tightened the cable glands.
Note
: The UPS charges the battery as soon as it is connected to the AC-power source, even if
button is not
pressed.
Once the UPS is connected to the AC-power source, 24 hours of charging are required before the battery can
supply the rated backup time.
Содержание 9SX Series
Страница 58: ...Page 58 614 20306 00 9SX 0 6 KVA EMEA_EN...
Страница 59: ...Page 59 614 20306 00 9SX 0 6 KVA EMEA_EN...
Страница 60: ...Page 60 614 20306 00 9SX 0 6 KVA EMEA_EN...