
Eaton 9PX Lithium-Ion User Guide DPD-9PX2205—Rev 01
19
33..88
IInnssttaallllaattiioonn ddeeppeennddiinngg oonn tthhee ssyysstteem
m eeaarrtthhiinngg aarrrraannggeem
meenntt ((S
SEEA
A))
Change in SEA between upstream and downstream or galvanic isolation required
8
10
8
10
or
Normal AC
Load
Main low
voltage
switchboard
(MLVS)
Isolation
transformer
Normal AC
Load
Main low
voltage
switchboard
(MLVS)
Isolation
transformer
33..99
P
Poow
weerr C
Caabblleess C
Coonnnneeccttiioonn
A
Acccceessss ttoo TTeerrm
miinnaall B
Blloocckkss
1.
Remove the terminal blocks cover (one screw)
2.
Punch the knockouts and insert the cables/conduits inside
High leakage current. Earth connection essential before connecting supply.
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the upstream protection device (Normal AC source) is open "O"
(Off). Always connect the ground wire first
If you ordered a HotSwap MBP, refer to the specific user manual to check the terminal blocks connection of
the UPS with the MBP.
Installation depending on the system earthing arrangement (SEA)
Содержание 9PX6KIRTN-L
Страница 16: ...10 Eaton 9PX Lithium Ion User Guide DPD 9PX2205 Rev 01 User Settings ...
Страница 40: ...34 Eaton 9PX Lithium Ion User Guide DPD 9PX2205 Rev 01 Recycling The Used Equipment ...
Страница 44: ...38 Eaton 9PX Lithium Ion User Guide DPD 9PX2205 Rev 01 Compliance Contact ...
Страница 49: ...Eaton 9PX Lithium Ion User Guide DPD 9PX2205 Rev 01 43 Model Specifications EMEA ...
Страница 50: ...DPD 9PX220501 DPD 9PX2205 01 ...