3.9 Installation checklist
Action
Yes / No
All packing materials and restraints are removed from each cabinet.
Each cabinet in the UPS system is placed in its installed location.
A cabinet grounding kit / mounting kit is installed between any cabinets
that are bolted together.
All conduits and cables are properly routed to the UPS and any ancillary
cabinets.
All power cables are properly sized and terminated.
Protective bonding conductor is properly installed.
Battery cables are terminated and connected to battery connectors.
Battery Shunt trip and Aux contact signal wiring is connected from the
UPS to the battery breaker (does not apply to Eaton 93E UPS).
Room ventilation is installed and operating correctly.
Air conditioning equipment is installed and operating correctly.
The area around the installed UPS system is clean and dust-free (it is
recommended that the UPS is installed on a level floor suitable for com-
puter or electronic equipment).
There is adequate workspace around the UPS and other cabinets. To al-
low emergency evacuation, an escape path with a minimum width of 600
mm must be maintained.
Adequate lighting is provided around all the UPS equipment.
A service outlet is located within 7.5 meters of the UPS equipment.
(OPTIONAL) Alarm relays and signal outputs are wired appropriately.
(OPTIONAL) A remote battery disconnect control is mounted in its instal-
led location and its wiring is terminated inside the UPS and battery cabi-
net.
(OPTIONAL) Accessories are mounted in their installed locations and
their wiring is terminated inside the UPS cabinet.
Start-up and operational checks are performed by an authorized Eaton
Customer Service Engineer.
3.10 Operation
EBC:F: Open the door and flip the breaker to turn the battery cabinet on or off.
Eaton 9PHD Accessory Cabinets TFC-A, EBC-F
and EBC-G
User's and installation guide
©