UPS System Installation
4-2
Eaton 9EHD UPS (80-200 kVA, 380/400/415V) Installation and Operation Manual
Figure 4-1. Removing the Front Shipping Bracket
5. Remove four bolts securing the rear shipping bracket to the cabinet and four bolts securing the bracket to
the pallet (see Figure 4-3). Remove the rear shipping bracket. If installing the cabinet permanently, retain
the shipping bracket and securing hardware for later use.
WARNING
Do not stand directly in front of the pallet while unloading the cabinet. If unloading instructions are
not closely followed, the cabinet may cause serious injury.
6. Slowly roll the cabinet toward the front of the pallet. Continue rolling the cabinet down the ramp until the
cabinet is clear of the ramp (see Figure 4-4).
7. Roll the cabinet to the final installation location.
8. If installing the cabinet permanently, retain the shipping brackets and hardware; otherwise, recycle the
pallet, ramp, and shipping brackets in a responsible manner.
9. Secure the UPS cabinet in position by lowering the leveling feet until the cabinet is not resting on the
casters and the cabinet is level.
10. If permanently mounting the system, proceed to Step 11;
11. Using the retained hardware, reinstall the shipping brackets removed in Step 2 and Step 5 to the front and
rear of the UPS cabinet with the angle facing outward (see Figure 4-1 and Figure 4-3).
12. Secure the cabinet to the floor with customer-supplied hardware.
Pallet
Front Door
Front Shipping Bracket
Shipping Bracket Bolts
Содержание 9EHD Series
Страница 39: ...UPS System Installation Eaton 9EHD UPS 80 200 kVA 380 400 415V Installation and Operation Manual 4 19 Notes...
Страница 81: ......
Страница 82: ...614 0 00...