-12-
5. Connection and Operation
5.1 Inspection:
Inspect the packaging carton and its contents for damage. Please
inform the transport agency immediately if you find signs of damage.
Please keep the packaging in a safe place for future use.
Note: To avoid any safety issue, please ensure that the incoming
feeder (mains) is isolated completely while whole installing
process.
5.2 Connection:
(1) UPS Input Connection
For 1K/2K/3K
If the UPS is connected via the power cord, please use a proper
socket with protection against electric current, and pay attention to
the capacity of the socket. The UPS System has an input breaker on
the standard cabinet.
For 1KXL/2KXL/3KXL
If the UPS is connected via the power cord (For 1KXL/2KXL model),
please use a proper external socket with protection against electric
current, and pay attention to the capacity of the socket: over 9A for
1KXL, over 18A for 2KXL,. If the UPS is connected via wires(For
3KXL model), it is recommended to select the 12AWG wire, and the
“GND” terminal should be grounded firstly by using the green/yellow
wire. The suggested tighten force is 5KgF.cm.The wiring diagram is
shown as the following.
The system may be installed and wired only by qualified
electricians in accordance with applicable safety regulations!
When installing the electrical wiring, please note the nominal
amperage of your incoming feeder.
Содержание 9E-IN 1K
Страница 1: ...Eaton 9E IN Series 1000 2000 3000 XL USER MANUAL ...
Страница 19: ... 16 Figure 5 2 1KXL Battery Connection diagram ...
Страница 33: ... 30 ...
Страница 42: ... 39 Appendix 1 Rear panel 1K 1KXL ...
Страница 43: ... 40 2K 2K 2KXL Output TB ...
Страница 44: ... 41 3K 3KXL ...