84
Copyright © 2021 Eaton Corporation plc. All rights reserved.
Chapter 6 UPS OPERATING INSTRUCTIONS
This section describes how to operate the UPS.
NOTE
•
Before starting the UPS, ensure all installation tasks are complete and a preliminary startup has
been performed by authorized service personnel. The preliminary startup verifies all electrical
interconnections to ensure the installation was successful and the system operates properly.
Read these instructions and have a thorough understanding of UPS operation before attempting
to operate any of the controls. The UPS is configured to operate with one of following nominal
voltages: 380, 400, or 415 Vac. Before operating the UPS, confirm the UPS nominal voltage and
frequency from display by selecting Settings -> Info. If the UPS need to be operated with another
voltage or frequency, contact your closest Eaton office or Eaton authorized partner.
• The UPS in not a measuring device. All displayed measurements are only approximate values.
6.1. Ups Controls and Indicators
6.1.1. Control Panel
The control panel is used to set up and control the UPS, and to monitor UPS operation. For a
description of the UPS control panel functions, see Section
6.1.2. LPS
The LED Power Show (LPS) consists of two rows of LEDs located on the left and right sides of
the UPS cabinet door. The LEDs are of red, green and yellow (RGY). The color of the LEDs is
used to show the condition of the UPS. Only one color is shown at one time. The most urgent
condition is always shown. The priority rank is Red,Yellow and Green.
Содержание 93PR Series
Страница 1: ...60 1200 kW Installation and Operation Manual Eaton 93PR UPS ...
Страница 2: ......
Страница 26: ...14 Copyright 2021 Eaton Corporation plc All rights reserved Figure 2 7 93PR 600kW UPS Wiring Diagram ...
Страница 142: ......
Страница 143: ...614 40061 01 ...