40
Eaton 93PM UPS 480V Three-Wire – 100 kW Frame Installation and Operation Manual 164000227—Rev 07
Figure 14. Removing the Pallet Skids and Supports – Eaton 93PM UPS
Cabinet
Mounting Bolts
(4 places front)
(4 places rear)
Pallet Skid
Skid Mounting Bolts
(4 places front)
(4 places rear)
Floor Protectors
(2 places front)
(2 places rear)
Right Side
Cabinet Support
Rear Cabinet
Support
Jacking Bolts
(2 places front)
(2 places rear)
Front Cabinet
Support
Cabinet
Support Bolts
(2 places at
each corner)
Left Side
Cabinet Support
WARNING
Do not remove or loosen the cabinet mounting or cabinet support bolts until instructed. If unpacking and
unloading instructions are not closely followed, the cabinet may tip and cause serious injury or death.
4.
Loosen, but do not remove, the skid mounting bolts holding the pallet skids to the front and rear supports,
and to the left and right side supports .
5.
If a sidecar is attached to the UPS, loosen, but do not remove, the sidecar skid mounting bolts holding the
sidecar pallet skids to the sidecar front and rear supports, and to the left and right supports (see
and
).
WARNING
RISK OF INSTABILITY. Turning the jacking bolts unevenly may cause the cabinet to become unbalanced. To
prevent tipping the cabinet, raise the cabinet no more than 3 mm (1/8") above the floor (just enough to allow the
removal of the pallet skids). Failure to follow these instructions can result in serious injury or death.
Содержание 93PM Series
Страница 4: ......
Страница 22: ...10 Eaton 93PM UPS 480V Three Wire 100 kW Frame Installation and Operation Manual 164000227 Rev 07 Introduction ...
Страница 134: ...122 Eaton 93PM UPS 480V Three Wire 100 kW Frame Installation and Operation Manual 164000227 Rev 07 Communication ...
Страница 138: ...16400022707 164000227 07 ...