52
Eaton 93PM Universal Integrated Battery Cabinet (IBC-LW and IBC-LHW) Installation Manual P-164000541—Rev 04
44..55..22
IInnssttaalllliinngg B
Baatttteerryy S
Shhuunntt TTrriipp IInntteerrffaaccee C
Coonnnneeccttiioonnss
NOTE 1
Disconnect terminal block plug from terminal block to wire plug.
NOTE 2
Because of the battery shunt trip wiring route in the Eaton 93PM UPS cabinet, the
wiring from the IBC shunt trip terminals to the UPS must use wire rated for 600V and
Class 1 wiring methods.
NOTE 3
If the inter-cabinet wiring access pass-through is not used to install the battery shunt trip
interface wiring connections, conduit must be installed between the battery cabinet and
the UPS cabinet.
NOTE 4
See paragraph
IBC Interface Wiring Preparation
, and
for wiring
and termination requirements.
NOTE 5
Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in
paragraph
, for UPS cabinet terminal locations.
To install wiring:
1.
If wiring the IBC shunt trip interface terminals using the line-up-and-match inter-cabinet wiring access
pass-through (see
) proceed to
; if wiring the IBC shunt trip interface terminals using the
top entry access, proceed to
; if wiring the IBC shunt trip interface terminals using the bottom entry
access, proceed to
.
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
2.
Line-Up-and-Match Wiring.
Route the battery shunt trip interface wiring from the UPS battery shunt trip
interface terminals through the bottom inter-cabinet access pass-through (see
) of the UPS
cabinet and IBC to the IBC battery interface terminal block TB2. See
for terminal locations.
3.
Proceed to
4.
Top Entry Wiring.
Remove the top conduit plate (see
) from the top of the IBC. Identify all
conduit requirements and mark their location. Drill and punch all conduit holes in the top conduit plate prior
to mounting on the IBC. Install the conduit plate and install all conduit runs into the plate. Pull the wiring
through the conduit into the wiring area.
NOTE
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
5.
Route the battery shunt trip interface wiring from the UPS battery shunt trip interface terminals through
the top of the IBC and the top IBC inter-cabinet wiring access pass-through (see
) to the IBC
battery interface terminal block TB2. See
for terminal locations.
6.
Proceed to
7.
Bottom Entry Wiring.
Remove the bottom conduit plate (see
) from the inside bottom of the
IBC. Identify all conduit requirements and mark their location. Drill and punch all conduit holes in the
bottom conduit plate prior to mounting on the IBC. Install the conduit plate and install all conduit runs into
the plate. Pull the wiring through the conduit into the wiring areas.
NOTE 1
In multiple IBC installations, route the battery interface wiring between IBCs through the
top of the adjacent IBC using the top inter-cabinet access pass-through (see
).
NOTE 2
In the following step, leave slack in the interface cables to allow breaker tray movement.
Содержание 93PM IBC-LHW