Oneline Drawings and Schematics
5-4
Eaton
®
Power Xpert 9395 Integrated Battery Cabinet (Model 1085 and 1085HR) Installation Manual
164201687—Rev 06
www.eaton.com/powerquality
5.2
Schematics
Figure 5-5 show the battery cabinet three-pole internal power wiring. Figure 5-6 through Figure 5-8 show the
battery cabinet breaker CB1 control wiring.
Figure 5-5. 1085 or 1085HR Battery Cabinet with Three-Pole Breaker Power Wiring Schematic