Power Xpert 9395 Integrated Battery Cabinet (Model 1085 and 1085HR) Installation Manual 164201687—Rev 06
www.eaton.com/powerquality
CAUTION
The 1085 and 1085HR battery cabinets CANNOT be intermixed. Serious damage to equipment
may result.
1.
Route one end of the battery cables through either the top or bottom of the cabinet to the battery
terminals. See paragraph 3.2.2 for wiring and termination requirements. See Figure 4-6 and Figure 4-7 for
wiring access information and terminal locations.
2.
Connect the positive, negative, and ground power wiring to the battery cabinet terminals (see Figure 4-7).
Use pressure and bus bar terminations as necessary.
Figure 4-6. Battery Cabinet Conduit and Wire Entry Locations
3.
If wiring to a battery disconnect, proceed to Step 6; otherwise, proceed to Step 4.
4.
Follow the required battery cable routing instructions specified in Section 3.2.2 above. Route and connect
the other end of the battery cables to the UPS cabinet battery input terminals E4 and E5 and ground
terminals. Refer to the applicable Power Xpert 9395 Installation and Operation manual listed in paragraph
1.7 for UPS cabinet terminal locations and termination requirements.
5.
Proceed to Step 8.
Top Entry Conduit Landing for DC Output and
DC Control Interface (TB1) Connections.
(Remove panel to drill or punch conduit holes.)
TOP VIEW
BOTTOM VIEW
Bottom Entry Conduit Landing for DC Output
and DC Control Interface (TB1) Connections.
(Remove panel to drill or punch conduit holes.)
Front
Front