EasyPro PA10 Скачать руководство пользователя страница 6

6

PA75 and PA100 Aeration Systems ...

The PA75 system uses a 3/4 horse power high-volume 
compressor with 800 feet of tubing 
and four air diffusers. The maxi-
mum operating depth is 18 feet. The 
PA100 system uses a 1 horse power 
compressor with 1000' of tubing and 
five air diffusers, maximum operating 
depth is 18'.

Assembly:

1. 

Unpack all the parts. Compare parts with packing list below to ensure all parts 
were received. If a shortage occurs, please notify us immediately.

2. 

Screw the round rubber membrane diffuser into the PVC base. Fill base with 
sand or small stone.

3. 

Slide one end of the tubing onto the barbed adapter on the PVC base and 
secure with a clamp (provided).

4. 

Attach the 2' piece of flex pipe into the outlet side of the compressor.

5. 

Unroll the entire roll of pipe. It is recommended that the pond diffuser be in-
stalled at this point. This will allow you to trim any unused pipe before attaching 
to the pump. Once installed and trimmed, attach the other end of the tubing to 
the flexible hose on the compressor.

6. 

Connect the valved outlet assembly to the compressor.

7. 

Connect the tubing to the flex hose on the compressor. Once the compressor is 
running, you may have to adjust the valves to equal the air flow to each diffuser. 
This corrects the difference in air flow caused by a difference in operating depth 
and/or tubing lengths.

• 

The PA100 system installs the same as PA75, it simply has five airlines instead 
of four.

After one or two years of operation, you will possibly notice a sudden drop in air 
bubbles. This is a sign the compressor needs new vanes. A rebuild kit is available 
(Part #RV75V for 3/4 HP compressor, RV100V for 1 HP) to restore like-new perfor-
mance. Be sure to keep the air filter clean. Filters can be washed in soapy water. 
Replacement filters are available.

PA50 and PA60 Packing List:

Description 

Quantity 

Packed

Air Compressor w/filter 

1

Valve Assembly 

1

Membrane Diffusers 

2

Tubing Clamps 

4

200' Roll Tubing 

1

 _____' Additional Tubing
Packed By: 

Date: 

# of Boxes:

Содержание PA10

Страница 1: ...A60 PA75 PA100 and Windmill Aeration Systems Diffused Aeration Systems Installation Operating Maintenance Guidelines Save this booklet for future reference Manuals also available on our website www Ea...

Страница 2: ...t maximum circula tion is sustained Systems that operate a few hours each day will just get the circulation going and then it is time to shut off If you are installing this system at a time when your...

Страница 3: ...ection using the clamp provided 4 Position the PVC manifold and airstones onto the white plastic underlay Use the plastic straps provided to attach the manifold to the underlay 5 Attach the other end...

Страница 4: ...mmended that the pond diffuser be in stalled at this point This will allow you to trim any unused pipe before attaching to the pump Once installed and trimmed attach the other end of the tubing to the...

Страница 5: ...installed and trimmed attach the other end of the tubing to the flexible hose on the compressor 6 Connect the valved outlet assembly to the compressor 7 Connect the tubing to the flex hose on the com...

Страница 6: ...attaching to the pump Once installed and trimmed attach the other end of the tubing to the flexible hose on the compressor 6 Connect the valved outlet assembly to the compressor 7 Connect the tubing t...

Страница 7: ...ing com pletely before attempting to install the diffuser as sembly in your pond Tubing needs to be weighted to sink Usually a three to five pound weight every six to eight feet is ade quate Weights c...

Страница 8: ...de the RA number original receipt in the form of an invoice or sales receipt name return address and phone number inside of the package No warranty claims will be honored without the original receipt...

Отзывы: