EasyPro PA10 Скачать руководство пользователя страница 4

PA33 Aeration System ...

The PA33 aerator features a 1/4 horse power 
continuous duty air compressor, 100' of 
tubing and a membrane diffuser. Once the 
air diffuser is assembled and the tubing is 
attached, you are ready to install the dif-
fuser into the pond. Always unroll the tubing 
completely before installing the diffuser. The 
diffuser can be lowered into your pond with a rope. Often a float, such as a duck 
decoy or a milk jug, will be used so retrieval of the diffuser is possible.

Assembly:

1. 

Unpack all the parts. Compare parts with packing list below to ensure all parts 
were received. If a shortage occurs, please notify us immediately.

2. 

Screw the round rubber membrane diffuser into the PVC base. Fill base with 
sand or small stone.

3. 

Slide one end of the tubing onto the barbed adapter on the PVC base and 
secure with a clamp (provided).

4. 

Attach the 2' piece of flex pipe into the outlet side of the compressor.

5. 

Unroll the entire roll of pipe. It is recommended that the pond diffuser be in-
stalled at this point. This will allow you to trim any unused pipe before attaching 
to the pump. Once installed and trimmed, attach the other end of the tubing to 
the flexible hose on the compressor.

The flexible membrane diffuser is buoyant (even if weighted hose is used) unless the 
base is filled with sand or gravel. Be sure to fill base at least 2/3 full. After one or two 
years of operation, you will possibly notice a sudden drop in air bubbles.  This is a 
sign that the piston rings have cracked and need replacing. Repair kit RP74RK has 
all the items necessary to rebuild your compressor.

4

bubbles.  This is a sure sign that the diaphram has cracked and needs replacing. 
Repair kit DC12RK has all the items necessary to rebuild your compressor.
Be sure to clean the inlet air filter on your compressor regularly. Wash dirty air filters 
in soapy water. Replacement filters are available.

PA12 Packing List:

Description 

Quantity 

Packed

Air Compressor w/filter 

1

PVC Manifold w/Check Valve 

1

Air Diffusers 

2

Tie Straps 

3

Tubing Clamps 

2

50' Roll Tubing 

1

 _____' Additional Tubing
12" x 21" Underlay 

1

Packed By: 

Date: 

# of Boxes:

Содержание PA10

Страница 1: ...A60 PA75 PA100 and Windmill Aeration Systems Diffused Aeration Systems Installation Operating Maintenance Guidelines Save this booklet for future reference Manuals also available on our website www Ea...

Страница 2: ...t maximum circula tion is sustained Systems that operate a few hours each day will just get the circulation going and then it is time to shut off If you are installing this system at a time when your...

Страница 3: ...ection using the clamp provided 4 Position the PVC manifold and airstones onto the white plastic underlay Use the plastic straps provided to attach the manifold to the underlay 5 Attach the other end...

Страница 4: ...mmended that the pond diffuser be in stalled at this point This will allow you to trim any unused pipe before attaching to the pump Once installed and trimmed attach the other end of the tubing to the...

Страница 5: ...installed and trimmed attach the other end of the tubing to the flexible hose on the compressor 6 Connect the valved outlet assembly to the compressor 7 Connect the tubing to the flex hose on the com...

Страница 6: ...attaching to the pump Once installed and trimmed attach the other end of the tubing to the flexible hose on the compressor 6 Connect the valved outlet assembly to the compressor 7 Connect the tubing t...

Страница 7: ...ing com pletely before attempting to install the diffuser as sembly in your pond Tubing needs to be weighted to sink Usually a three to five pound weight every six to eight feet is ade quate Weights c...

Страница 8: ...de the RA number original receipt in the form of an invoice or sales receipt name return address and phone number inside of the package No warranty claims will be honored without the original receipt...

Отзывы: