ASSEMBLY
• Attach one of the Upper Frame Beams [B] to the Main Frame Sides
[A]
with 4
sets of M16 x 2.00 x 35 mm Bolts, Nuts and Washers
(FIG 1)
.
NOTE:
Do Not fully tighten hardware until all pieces are assembled to allow for
alignment.
• Join the Main Frame Sides
[A]
, the Base Rails
[C]
and the flanges of the Lower
Cross Member
[D]
together with (4) sets of M12 x 1.75 x 35 mm Bolts, Nuts and
Lock Washers
(FIG 2)
.
• Add the four Angle Braces
[E]
between the Main Frame Sides
[A]
and the Base
Rails
[C]
with (8) sets of M10 x 1.50 x 25 mm Bolts, Nuts, Washers and Lock
Washers
(FIG 3)
.
• For safety, allow the partial assembly to remain on its side.
• Hook the fingers on one side of the Yoke Plate
[P]
over the lower “C” channel
edge of the previously attached Frame Beam
[B] (FIG 4)
.
• Next, with the assistance of a helper, slip the lower “C” channel edge of the 2nd
Frame Beam
[B]
under the opposite fingers of the Yoke Plate
[P]
and attach the
Beam with (4) sets of M16 x 2.00 x 35 mm Bolts, Nuts and Washers
(FIG 5)
.
• Securely tighten all hardware at this point.
FIG. 1
FIG. 1
FIG. 2
FIG. 2
FIG. 3
FIG. 3
FIG. 4
FIG. 4
FIG. 5
FIG. 5
INJURY HAZARD!
The Eastwood 20 Ton Floor Shop Press consists of heavy metal
components which can cause potentially serious injuries if allowed
to drop.
Obtaining the assistance of a helper during the following assembly
steps is required.