4
Eastwood Technical Assistance: 800.343.9353 >> [email protected]
ASSEMBLY
• Thread the Regulator unit
into the 1/2” FNPT port
on the right side of the
Housing
(FIG 1)
.
• Thread the Regulator Key
into the opening at the
front of the Regulator
unit
(FIG 1)
.
INSTALLATION
• The Filter/Regulator should be installed as close as possible to any air tools and spray guns
to be used.
• Securely mount the Filter/Regulator unit in a vertical position using the integral mounting
bracket.
• Connect the air inlet to the 1/2” FNPT at the cast-in, “AIR IN” port of the Housing
• Be sure to connect outlet to a clean air hose to prevent contamination of the filtered & dried air.
• Open inlet valve to pressurize system and check for leaks.
Shut-off and release all pressure from air lines and the system before
attempting any installation, servicing or performing any maintenance.
A suitable air shut-off valve (Not Included) should be installed before the
Filter/Regulator so the unit can be easily depressurized for servicing.
FIG. 1