4
Eastwood Technical Assistance: 800.343.9353 >> [email protected]
ASSEMBLY PREPARATION
• Obtaining the assistance of a helper during assembly is necessary.
DO NOT
attempt to construct this Body Cart without assistance!
• The use of ANSI approved safety shoes, head protection gear and eye protection is necessary.
• Perform assembly in a large, uncluttered area close to area of intended usage.
• Allow sufficient area for operator and helper to remain clear when choosing operating area.
• Use only on a firm, smooth, level and clean work surface. DO NOT use on a sloped or rough textured surface, earth, grass, sand, gravel
or any other loose surface.
•
DO NOT
attempt to move Body Cart on sloped surfaces while loaded.
•
DO NOT
attempt to raise or lower the Support Pads while the Body Cart is supporting a load.
INJURY HAZARDS!
The Eastwood Body Cart consists of heavy metal components (151 lbs. [68.5kg.] assembled weight) which can cause potentially
serious injuries if allowed to drop. Avoid pinching hands while handling parts during assembly.
To prevent scratches and damage to the finish of the Body Cart components, it is strongly advisable to use cardboard, carpet,
blankets etc. covering a minimum 10’ x 10’ area before beginning assembly.
ASSEMBLY
JOIN LONG/SHORT CORNER SUB-ASSEMBLIES [A] TO
SHORT/LONG CORNER SUB-ASSEMBLIES [B] WITH [C]
TO CREATE TWO FRAME HALVES
Note that the Long/Short
[A]
& Short/Long Corner
[B]
Assemblies are mirror images of one another
(FIG 1)
.
All Square Tubes
MUST
be installed with the through holes
punched in the sides in the
HORIZONTAL
position.
1.
Assemble one entire side of the Body Cart frame by
placing one each Long/Short
[A]
& Short/Long Cor-
ner
[B]
Assembly on the floor with the
Longer
arms
facing another and resting on their caster mounting
square flanges
(FIG 1)
.
2.
Slip one end of a Long 40mm Square Tube, Interme-
diate Connector
[C]
into the
Long
square tubing arm
of
[A]
.
3.
Slip the opposite end of the Long 40mm Square
Tube, Intermediate Connector
[C]
into the
Long
square tubing arm of
[B] (FIG 2)
.
4.
Thread two 10mm Knob Bolts
[P]
into the threaded
bosses at the outer ends of the long arms and lightly
hand tighten to keep tubes from sliding
(FIG 2)
.
5.
Repeat above steps 1, 2, 3 & 4 for remaining opposite
frame side, Long/Short
[A]
& Short/Long Corner
[B]
and Intermediate Connector
[C]
Assemblies.
FIG. 1
A
B
FIG. 2
A
B
C
P
✓
✓