A
F
H
(both sides)
N
O
Q
U
FIG. 1
R
✓
✓
✓
1” 2” 3” 6” 8” 10
✓
✓
4
Eastwood Technical Assistance: 800.343.9353 >> [email protected]
SET-UP
• The Eastwood Shear, Brake and Slip Roll must be securely mounted on a heavy, solid workbench, stand, floor etc, capable of holding the static weight
of the unit plus the stresses from operation.
• Place the Shear, Brake and Slip Roll over the chosen location, then mark mounting hole locations by tracing holes in the feet.
• The use of 3/8” through bolts & nuts or longer lag screws with substantial washers and attachment to a structural member is absolutely necessary.
Check for the presence of electrical, air or other utility lines under the mounting surface before drilling mounting holes.
ASSEMBLY
• Install Handle Assembly
(A)
to left or right hand side by removing the Socket Head Cap Screws using a 5mm Hex Key (not Included) from the Cap
(B)
on
the Handle Hub, Place the bar of the Handle Assembly into the slot then replace Cap and reinstall screws
(FIG 1)
.
• Add the Stop Bar
(C)
to the rear of the Shear, Brake and Slip Roll by threading the ends of the Side Rods into either set of threaded holes in the rear of the
Frame.
NOTE:
There are 2 possible positions for the Stop Bar:
-
For Bending:
Install the Rods
(D)
into the upper set of holes with the Stop Bar
(C)
angle edge up
(FIG 2)
.
-
For Shearing:
Install the Rods
(D)
into the lower set of holes with the Stop Bar
(C)
angle edge down
(FIG 3)
.
• Tighten Side Rods in place by tightening the 18mm jam nuts with a 18mm wrench (not Included).
• Place Clamp Bar
(E)
pins into 2 holes in front face of the Moving Blade/Brake Bar
(F) (FIG 1)
.
J
P
U
✓
O
Q
✓
A
✓
✓
✓
✓
✓
J
✓
M
✓
G
✓
B
✓
✓
B
✓
✓
✓
✓
E